My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01672
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:12 PM
Creation date
10/11/2006 10:36:22 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powel-Glen Canyon Adaptive Management
Basin
Colorado Mainstem
Water Division
5
Date
10/17/1995
Title
Western Area Power Administration-Final Will Be Organization
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />01400 <br /> <br />Customer Senrice Regions <br /> <br />The August 1995 proposed "Will Be" included a variety of changes that are common to each <br />newly named region. The construction management function was centralized under the CSO with <br />three field offices located in Huron, Loveland, and Phoenix, The Facility Planning function was <br />consolidated with the Maintenance Engineering function. The Transmission Studies function was <br />consolidated with the Resources Planning function under the Power Marketing function. The <br />control center SCADA software support was moved to operations (nit formerly resided in <br />maintenance) and hardware maintenance was moved to maintenance (nit had been in operations). <br />A modular approach for Maintenance was adopted that reduced a layer of supervision. <br /> <br />The proposed "Will Be" also called for eliminating the deputy area manager position and <br />establishing at least one project manager position in each region. The Financial Management <br />function was to be separated from Management Services as a direct report to the Regional <br />Manager. The IRM function was proposed to be contracted in at 70 percent Federal and 30 <br />percent contract with staffing levels adjusted based on a percentage oftota! staffbasis. The <br />responsibility for transportation of hazardous materials was to be shifted from Environment to <br />Safety. <br /> <br />The fina1 "Will Be" includes the following modifications to the proposed "Will Be" in response to <br />employee conunents: <br /> <br />o The location of SCAD A hardware maintenance was left to local p.cf".....ce. <br /> <br />o The general target level for IRM was changed to 50 percent Federal/50 percent contractor. <br /> <br />o The responsibility for transportation of hazardous materials will remain in Environment. <br /> <br />o The construction field office procurement position was moved into the regional <br />procurement and property office. <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.