Laserfiche WebLink
<br /> <br />2001 <br /> <br />TABLE 1. <br /> <br />APPARENT INFLOW TO HERON RESERVOIR <br /> <br />(UNIT = ACRE-FEET) <br /> <br />TABLE 1 WILLOW TRIBUTARY TRIBUTARY COMPUTED <br />Inflow to Heron AZOTEA COMPUTED CREEK INFLOW COMPUTED INFLOW NATURAL <br /> TUNNEL CHANNEL ABOVE ABOVE INFLOW WITHIN FLOW <br />MONTH OUTLET LOSS HERON HERON TO HERON HERON AT HERON <br /> RESERVOIR RESERVOIR RESERVOIR RESERVOIR RESERVOIR <br /> 13+2-1) (4)*FACTOR TBL213or4) 5+6 orSEEP <br /> m 12\ ~ f4) 15\ (6) (7) <br /> Ii 01 01 ---r I I - <br /> I I <br />JANUARY , 0 01 0 688 688 <br />! <br />FEBRUARY 0 0 0 0 0 1935 1935 <br />MARCH 1512 0 6810 5298 6358 3213 9571 <br />APRIL 19284 39 23583 4338 5206 1781 6987 <br />MAY 51092 102 48664 -2326 0 131 131 <br />JUNE 29283 59 28329 -895 0 138 138 <br />JULY 4643 9 4530 -104 0 145 145 <br />AUGUST 4455 9 4305 -141 0 146 146 <br /> , <br />SEPTEMBER 313 0 242 -71 0 141 141 <br />OCTOBER I 0 0 0 0 0 145 145 <br />NOVEMBER 0 0 0 0 0 137 137 <br />DECEMBER 0 0 0 0 0 490 490 <br />ANNUAL 110582 218 116463 6099 115641 9090 20654 <br /> <br />(5) COMPUTED INFLOW TO HERON RESERVOIR=TRIBUTARY INFLOW ABOVE HERON <br />TIMES CORRELATION FACTOR (1.2 FOR MONTHLY WILLOW CREEK NATURAL <br />FLOW ABOVE 360 AF AND 2.46 FOR FLOW AT 360 AF AND BELOW. IF THE <br />INFLOW DOES NOT EXCEED THE SEEPAGE THIS FLOW IS NOT BYPASSED. <br />FLOWS ABOVE THE SEEPAGE ARE BYPASSED.) <br /> <br />(6) THIS COLUMN REPORTS THE SEEPAGE 2(4) AS THE BASE NATURAL FLOW OR <br />THE NET GAIN ON RESERVOIR 2(3) WHICH EVER IS GREATER OR ZERO WHEN <br />2(3) IS ZERO AND 1 (5) IS MORE THAN SEEPAGE. (SEE TABLE 2) <br /> <br />(7) THIS COLUMN REPORTS THE SUM OF 1 (5) AND 1 (6) ONLY WHEN 1 (5) EXCEEDS <br />THE SEEPAGE. THIS WILL PREVENT ANY DOUBLE ACCOUNTING OF THE BASE <br />NATURAL FLOW (SEEPAGE). IF 1(5) IS LESS THAN OR EQUAL TO SEEPAGE THEN <br />1(7) EQUALS 1(6). <br />