Laserfiche WebLink
<br />SUMMAR Y SHE ET <br /> <br />Effects on the Colorado River <br /> <br />Decrease in salt load from Palo Verde subarea (initial year, tons) <br /> <br />88,600 <br />1/ 7.9 <br /> <br />Reduction in salt concentration at Imperial Dam from <br />decrease in salt load (annual equivalent, mg/L) <br /> <br />Project Features <br />Laterals to be lined (miles) <br /> <br />Estimated Costs <br /> <br />Construction costs (January 1981 costs) <br /> <br />Li n i ng <br />IMS and onf arm progr am <br />Interest during construction <br /> <br />Total investment costs <br /> <br />Annual equivalent costs <br /> <br />Annual operating costs <br />Total annual costs <br /> <br />Cost per mg/L of salinity reduction at Imperial Dam <br /> <br />1/ Table 3 of the PVID 1980 Status Report indicated <br />and irrigation efficiency improvements would reduce <br />The different figures presented here are based upon <br />proposed Sun Desert Nuclear Powerplant. <br /> <br />iii <br /> <br />20 <br /> <br />$17,000,000 <br />4,000,000 <br />2,778,000 <br /> <br />$23,778,000 <br /> <br />1,805,000 <br /> <br />105,000 <br />$ 1,910,000 <br />$242,000 <br /> <br />that lateral lining <br />salinity by 7.6 mg/L. <br />conditions without the <br /> <br />~,. "2925 <br />