Laserfiche WebLink
<br />, ' <br /> <br />diversion requirements of an improved distribution system would provide <br />additional power generation benefits. The PVID has indicated an interest in <br />rehabilitating their entire distribution system under a program similar to <br />Reclamation's Small Reclamation Projects Act (Public Law 84-984, as amended). <br /> <br />Following transmittal of a Regional Director's report to Con9ress and authori- <br />zation of the unit for construction, advance planning studies will begin. <br />Costs and designs will be refined; and operation, maintenance, and repayment <br />contracts will be negotiated and signed with the PVID. <br /> <br />Assuming Congress authorized construction of the unit in 1985 following <br />detailed studies, construction could begin in 1989, using current procedures <br />and would probably be complete by 1995. Monitoring of system salt loads <br />would continue throughout advance planning and during and after construc- <br />tion to determine effectiveness of the plan. <br /> <br />C I' r, 9 '.1 4 <br />~ ,J'- /..,; <br /> <br />ii <br />