My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01617
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:53 PM
Creation date
10/11/2006 10:34:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1984
Author
BOR
Title
Colorado River Basin Salinity Control Project - Protective and Regulatory Pumping Unit - Title I Division
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />CRBSCP, Proleclive and Regulalory Pumping Unil <br /> <br /> <br />t,,) <br />o <br />~ <br />-..l <br /> <br />COlOlACO IIYII ....SlN '.....li'll'l" 001\11101. rtOJfCl <br />Tlnl I DIY1510,," <br />,IOUCTlY! I ItOULAron _.INO U"" <br /> <br />~ <br /> <br />t <br /> <br />...,......:..... <br /> <br />~, <br /> <br />'-- <br /> <br />TW........In"I'.TW. <br />....y........ <br /> <br />"- <br /> <br />...... __ <o~....<.,_ .._._ <br />0"_ 0'_ _........_ ._., <br /> <br />........... <br /> <br />--::.-:. I 7 ~_ 0'-10._ .-.......-. .......- <br /> <br /> <br />'__'~O '--""'-L <br />~,Jr <br />.... I!.... o~~~.. 4 r . <br />.t'C"O~...tll <br />'- <br />, --'......... <br /> <br />-', <br /> <br />"- <br /> <br />CRBSCP . Protective and Regulalory Pumping Unit <br /> <br />Proleclive and Regulalory Pumping Unil Well Field <br />and 242 Lateral <br /> <br />The existing unit wells are located in a continuous line~ <br />spaced at O.S-mile intervals along the southern pottion of <br />Yuma Mesa next to the Southerly International Boun- <br />dary. This field now consists of 21 wells and is to expand <br />to a possible 35 well.. <br /> <br />Plans for the well field development include completing <br />the 14 additional wells in a line 1 mile north of the <br />initial group. The rate of installation of these wells will <br />be determined by the rate of decrease in drainage flows, <br />the amount of change in the ground-water table. and the <br />rate at which private irrigation and municipal users <br />withdraw ground water by private wells. Maximum <br />ground-water pumping within the S-mile zone will be <br />limited to 160,000 acre.feet per year. <br /> <br />The pumping of ground water through 1990 would <br />ensure the capability of the United Stales to meet the <br />140,000 acre-feel per year obligation of water custom- <br />arily delivered to Mexico at the Southerly International <br />Boundary. Excess pumping capability from the well. will <br />be available to supply additional water requirements for <br />irrigation, municipal. and other uses. <br /> <br />HilIander "C" Irrigation District, which is a private <br />development adjacent to the well field. has entered into <br />a temporary water contract with the U.S. Government <br />for pumping up to 4,000 acre-feet of water per year from <br />the 242 Lateral, and 8 permanent contract is being <br />developed. This district includes about 3,44.0 acres, with <br />about 2,300 acres currently under irrigation. <br /> <br />The 242 Well Field, along with pumping in Mexico, may <br />have a notable impact upon the existing private wells by <br />lowering the ground-water levels. Domestic users in the <br />5-mile zone, other than HilIander"C' Irrigation District, <br />are pumping about 4,000 acre-feet of water annually for <br />municipal and irrigation use. The 242 wells are driJIed <br />to a depth of about 600 feet; the lower 300 feet are <br />screened. Each well is designed to pump an average of <br />7.5 cubic feet per second. The discharge of each well <br />is collected in the 242 Lateral, which is a conveyance <br />system that carries wafer westerly to the downstream side <br />of the existing Boundary Pumping Plant, a facility of the <br />Valley Division of the Yuma Project. <br /> <br />The 242 Lateral is designed as an open and closed sys- <br />tem consisting of a pipeline on each end and an open <br />concrete-lined channel in the center. The reinforced <br />concrete pipe ranges from 27 to 72 inches in diameter, <br />
The URL can be used to link to this page
Your browser does not support the video tag.