Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />the site. At the very least, one monument can be set on the site and the stage and <br />discharge can be monitored during runoff season. The remainder of the topographic <br />surveying can be performed at any time. <br /> <br />Project Status: <br />The project should be considered on-track and ongoing. <br /> <br />FY 97 Budget: <br />Funds Provided: 214,269.13 (61,378.54 carryover from 1996) <br />Funds Expended: 134,699.22 <br /> <br />Difference: 79,569.91 <br /> <br />The initial 1997 budget was drafted for approximately 15 new sites. Prior to the end of the <br />fiscal year only six sites were surveyed. Since that time two additional sites have been <br />surveyed and the office work is ongoing. In addition, three additional sites on the <br />Gunnison River should soon be available to survey. <br /> <br />Recovery Program funds spent for publication charges: NIA <br /> <br />Status of Data Submission: N/A <br /> <br />Signed: <br /> <br />Gus R. Steppen, E.I.T. <br />Principal Investigator <br /> <br />12-5-97 <br /> <br />Appendix: For more detailed information on the 1996 data, please refer to: FLO <br />Engineering, Inc. , 1997 "Green River Floodplain Habitat Restoration Investigation, Bureau <br />of Land Management Sites and Ouray National Wildlife Refuge Sites, Near Vernal Utah <br />Final Report September 1997." <br /> <br />5 <br />