My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01535
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01535
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:31 PM
Creation date
10/11/2006 10:31:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.750
Description
San Juan River General
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
12/1/1986
Author
Western Research Cor
Title
Economic Analysis of Potentially Irrigable Parcels in the Animas and Florida Watersheds - December 1986
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />oalS!l <br /> <br /> Table 3-1 <br />Estimated Canopy and Brush Removal Costs <br /> by Land Category <br />Land Current Cost/Acre Annualized <br />Category (1985 Dollars) Cost/Acre <br />I $35.00 $3.00 <br />II 57.00 4.85 <br />III 95.00 8.10 <br /> <br />The second column of Table 3-1 is the estimated current cost per <br /> <br /> <br />acre for each clearing operation. The third column gives annualized <br /> <br /> <br />cost estimates over 50 years with an 8 3/8 percent discount rate. The <br /> <br /> <br />latter figures were used in adjusting preliminary repayment capacities <br /> <br /> <br />since they are also annualized. <br /> <br />It should be noted that the costs given in Table 3-1 do not <br /> <br /> <br />include costs for unskilled labor. This adjustment was made because <br /> <br /> <br />land clearing and preparation costs were assumed to be a construction <br /> <br /> <br />activity. The U.S. Water Resources Council (WRC) Principles and <br /> <br /> <br />Guidelines (1983) allow for the use of a zero opportunity cost for <br /> <br /> <br />unskilled labor in construction activities on water projects if the <br /> <br /> <br />project area is one of high unemployment. For purposes of this <br /> <br /> <br />analysis, it was assumed that the high unemployment assumption holds. <br /> <br /> <br />It should be noted that land leveling costs are not explicitly <br /> <br /> <br />addressed in either the Level A or Level B economic analyses. Any <br /> <br /> <br />such costs necessary to adapt an appropriate irrigation technology to <br /> <br /> <br />the contours of the parcel were considered in the agricultural <br /> <br /> <br />engineering analysis conducted by Boyle Engineering. <br /> <br />4 <br /> <br />l <br />
The URL can be used to link to this page
Your browser does not support the video tag.