My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01511
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01511
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:24 PM
Creation date
10/11/2006 10:30:16 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.800
Description
Dirty Devil Unit - Colorado River Salinity Control Program
State
UT
Basin
Colorado Mainstem
Date
4/1/1983
Title
Dirty Devil River Salinity Control Unit
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROJECT SCHEDULE <br /> <br />Our study was initiated in 1982 and will be completed in 1986 with prepara- <br /> <br />tion of a Planning Report/Draft Environmental Statement. Several interme- <br /> <br />diate steps will be taken in evaluating study findings to determine if po- <br /> <br />tential for salinity control is available and worthy of further study. <br /> <br />The first step is known as the preliminary findings stage, which is sched- <br /> <br />uled for completion within the next month, and culminates in a Preliminary <br /> <br />Findings Report. In order to prepare this report, we are conducting analy- <br /> <br />ses of salinity control alternatives developed to date. Based upon prelim- <br /> <br />inary data we anticipate that feasible control methods can be found and the <br /> <br />study will continue. <br /> <br />The second step 1S know as the plan formulation stage. This stage is <br /> <br />scheduled to be completed 1n November of 1984. In this stage, various <br /> <br />identified alternatives will be more thoroughly analyzed, and a "best plan" <br /> <br />will be selected for further development. <br /> <br />Once the project plan has been selected and technical studies are complete, <br /> <br />the Planning Report/Draft Environmental Statement will be written. This <br /> <br />report undergoes an extensive review and eventually goes to Congress for <br /> <br />project construction authorization and appropriation of funds. <br /> <br />A su~nary of these activities is displayed on the attached bar chart. <br /> <br />002486 <br /> <br />(10) <br />
The URL can be used to link to this page
Your browser does not support the video tag.