My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01507
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:23 PM
Creation date
10/11/2006 10:30:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1983
Title
Aquatrain - A Cooperative Effort Government and Private Industry
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />POTENTIAL OPPORTUNITiES FOR USING SALINE WATER AT POWERPLANTS ALONG PROPOSEO AQUATRAIN ROUTE (Cont) <br /> <br />Name <br />Ivanpah <br /> <br />Lead Utility/Owner <br /> <br />Southern <br />Cal ifornia <br />Ed I son <br /> <br />Blythe <br /> <br />San Diego Gas <br />& Electric <br /> <br />.... <br />..... <br /> <br />MW Capacity <br /> <br />3 ea - 500 MW <br />Units <br /> <br />Has not been <br />determi ned <br /> <br />Current Status <br /> <br />Amount of <br />..Cooll"g Water <br /> <br />SCurrentf <br />Duree 0 <br />Cooling Water <br /> <br />Colorado River <br />(Lake Mohave) <br /> <br />Proposed Plant 25,000 AF/YR <br />Units ,.scheduled on <br />1 i ne between 1991 <br />and 1993 <br /> <br />San Diego Gas & 33,000 AF /YR <br />Electric has <br />acquired the site <br />but has no definite <br />pl ani' as to when the <br />plant will be built, <br />Possibly mid-1990's, <br /> <br />Palo Verde <br />Outfall Drain <br /> <br />(\ r 1...... '''- j" <br />,j ~.; .....t ..... <br /> <br />Proposed Saline Source <br />of Coo11"g Water <br /> <br />Las Vegas Wash <br /> <br />Salt Load Removed <br />Tons/Year <br /> <br />6B,OOO <br /> <br />Palo Verde Outfall <br />Drain <br /> <br />76.000 <br /> <br />!! Total salt load to be removed from Big Sandy River is the total of 41.000 tons/year (7,000 AF) at Chevron phosphate plant, 30,000 tons/year <br />(5.000 AF) at Texas Gulf Trona ProcessiHg Plant and 45,000 (7.550 AF) at Jim Bridger Powerplant, <br /> <br />Y Firm yield from the Price-San Rafael Rivers for use at Hunter and Huntington Powerplants is 17.500 AF, The remaining 10,500 AF will be made <br />up from non-firm Price-San Rafael River water or existing fresh water sources. Total salt load removed of 145,000 tons/year is based on <br />28,000 AF. ,. . <br /> <br />~ Salt load removed at IPP is based on fi~ yield of 15,500 AF of Glenwood-Dotsero Springs water and 2.700 AF of Dirty Devil River water. The <br />remaining required cooling water of 17,800 AF (36,000 -.18,200) will come from existing fresh water sources, non-firm Price San Rafael River <br />water or other Colorado RiVer" saline water sources. <br />J . <br /> <br />(,. <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.