My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01507
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:23 PM
Creation date
10/11/2006 10:30:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1983
Title
Aquatrain - A Cooperative Effort Government and Private Industry
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t' r: 10 r-, ') <br />U t_, ,j......... <br /> <br /> FIGURE 2 <br /> POTENTIAl OPPORTUNITIES FOR USING SALINE WATER AT POWER PLANTS ALONG PROPOSEO AQUATRAIN ROUTE <br /> Cu rrent <br /> Amount of Source of Proposed Saline Source Salt Load Remoyed <br /> ~ Lead Ut11lty/Owner MW Capacity Current Status Coo li ng Water COOling Water of Cooling Water Tons/Year <br /> Jim Bridger PacifIc Power 4 ea - 500 NW All units on line 20,000 AF/YR Green River BIg Sandy River 116,OOo!! <br /> & Light Units UnIt <br /> Hunter Utah Power & 2ea-400NW 3rd Unit to be 18,000 AF/YR Cottonwood Price-San Rafael <br /> L1 ght Units operating. completed summer 83. for UnIts I, Creek Rivers Unit <br /> 3rd 400 NW 4th UnIt (400 MW) 2. 3, & 4 <br /> UnIt under Is planned but <br />...... construction. deferred. l45,OOoY <br />'" HuntIngton Utah Power & 2ea-400MW All unIts on lIne 10,000 AF/YR HuntIngton Pri ce San Rafael <br /> L1 ght Units Creek Rivers Unit <br /> Intermountain Los Angeles 2 ea - 750 NW UnIts 1 & 2 under 36,000 AF/YR Groundwater & Water delIvered via 281,000 Glenwood- <br /> Power Project Dept of Water Units construction for Units I, Sevier River Aquatra1n from Dotsero <br /> & Power 2 addItIonal Unit #1 scheduled 2, 3, & 4 Price-San Rafael 38,000 Dirty Oeyll <br /> 750 MW units on line 7/86 River, Oirty Oevll 3l9,OOo!l <br /> pI anned. Unit #2 schedule~ River and Glenwood. <br /> on line 7/87 Ootsero SprIngs <br /> 3rd & 4th 750 MW <br /> UnIts planned but <br /> deferred. <br /> White PIne los Angeles 2 ea - 750 NW Proposed Pl ant 22,000 AF/YR Groundwater None <br /> Oept of Water Units UnIt #1 scheduled <br /> & Power on line mld-1989 <br /> UnIt #2 scheduled <br /> on line mld-1990 <br /> Harr'y Alle, Nevada Power 4 ea - !;CO MY Proposed Plant 32,000 AF/YR Las Vegas Lower VIrgIn River <br /> Ur.lts UnIt #1 scheduled Municipal <br /> on li ne 1994 Wastewater <br /> Unit 12 scheduled <br /> on line 1995 <br /> Unit #3 scheduled <br /> on line 1996 <br /> UnIt #4 scheduled 202,000 <br /> on line 1997 <br /> "0 have Southern 2 ea - 790 MW All units on lIne 21,000 AF/YR Co 1 orado RI ver Lower Virgin Rlyer <br /> Ca llfornla UnIts <br /> Edison <br />
The URL can be used to link to this page
Your browser does not support the video tag.