My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01472
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01472
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:10 PM
Creation date
10/11/2006 10:27:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.150
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1975
Title
Plan of Work Outline: On-Farm Salinity Control Investigations for the Grand Valley Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OJ <br />L') <br />.:.> <br />'1""'4 <br /> <br />, <br />..- <br /> <br />(~) <br /> <br />16 <br /> <br />Funding and Staffing <br /> <br />See Attachment 1. <br /> <br />Progress Reports <br /> <br />Progress reports will be prepared annually (November) except that signi- <br />ficant accomplishments and phases of work needed for coordination with <br />other agencies and organizations will be distributed a.s developed. <br /> <br />Schedule of Planned Activities <br /> <br />FY 1975 -- November 1974 - June 1975 <br /> <br />1. Prepare a detailed schedule within limits of survey, budget <br />and manpower. <br /> <br />2. Secure needed aerial photography, maps, and farm plats; <br />interpret soils information for irrigation design and <br />update Irrigation Guide. <br /> <br />3. A.ssemble and review available research and basic data and <br />develop an iIiterface with on-going multiagency actiyities in <br />the Grand Valley. <br /> <br />4. Develop and maintain connnunication with the :_ocal people to <br />obtain their inputs into the program, and to keep them <br />informed of program activities. <br /> <br />5. Develop worksheets and inventory status of present irrigation <br />water management systems on a field-by-field basis for each <br />delivery lateral. Concurrently, develop inventory of needs <br />to improve systems, unit costs, and design efficiencies. <br /> <br />6. Develop worksheets and inventory cultural management levels <br />on present systems. Concurrently, determine potential for <br />three management levels on improved systems. <br /> <br />7. Set up the irrigation budget generator on the computer for <br />each lateral system. <br /> <br />8. Assemble data for economic, social, environmental, and insti- <br />tutional base. <br />
The URL can be used to link to this page
Your browser does not support the video tag.