My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01467
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:08 PM
Creation date
10/11/2006 10:27:28 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
3/6/1967
Author
USDOI
Title
Tenth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(lOLOnAllO, ,nrvEll' STORAGE 'PROJECT, <br /> <br />11 <br /> <br />Fontenelle Dam was completed during. April "l,964 and storage of <br />water was initiated. On September 3, 1965, a serious leak developed <br />through the right abutment of the dam, and since that time an <br />extensive repair program has been underway. The bulk of .this <br />work so far has involved regrouting of the right abutment rock and <br />supplemental grouting elsewhere throughout the dam foundation. <br />About 90 percent of the grouting work has been accomplished. <br />Other than the repair work underway on. Fontenelle Dl1m, the <br />Seedskadee project program 'centers on the development farm, which <br />is just completing its first full year of operation. The farm is being <br />operated by the University of Wyoming under the generalsujJervision' <br />of an adVIsory committee, which includes representation from the <br />Bureau of Reclamation, Agricultural Research Service, Soil Con- <br />servatio~ Service, and the University of Wyoming. The studies on <br />the farm will provide valuable and needed informatio\l on water <br />management practices, crop production and. livestock-handling <br />techniques, arid theh-: relationship to the optimum size of fl1mily <br />farm units for the. Seedskadee project lands. Detailed' records are <br />being kept as a basis for initiation of agricultural economic studies <br />preparatory to development of the Seedskadee project. .At least 1 <br />additional year of full .operation, concurrent with the above' studies, <br />is desh-able to support and adjust the initial data. However, yields <br />attained during the 1966 season'indicate the soils are productive tinder <br />proper management. , "'.' '..' , <br />Recreational development completed in the "Area general" of <br />Fontenelle Reservoir irlcludes a boat lauJJ,ching ramp, picnicking and <br />camping'facilities, and 'utility and office buildings. . .." , <br />Amemorandum of agreement (contract No. 14-06-400-4402) was <br />executed' by the Bureau of Reclamation and Bureau .of Sport Fisheries <br />and Wildlife to establish acompatible commonbouridary betwe\m the' <br />Seedskadee National Wildlife Refuge and adjoining' farm units' of <br />tI:e Seed~kadee Pfoje?t, 'Wyoming. To ~~minist~r .certain reclamation <br />WIthdrawn and acqUIred lands ",nd addItIOnal pl'lvate land puri;hased <br />with section 8 funds, 'the Bmeau of Sport. Fisheries and Wildlife <br />appointed a refuge manager to aid the detailed planning and)nitial <br />management operationst . ,', \~";'. ' <br /> <br />SILT PAR'J;'ICIPATING PROJECT, COLonA,DO <br /> <br />This is a multipurpose project which will provide' a supplemental <br />water supply for 4,628 acres and a full supply for 2,416 acres of new <br />land in west-central Colorado in Garfield County near the town of <br />Rifle, Colo. Theproject will also provide fish and wildlife and recr,ea- <br />tion benefits.' " . ",' <br />The principal featme,; include the Rifle Gap Dam on Rifle, Creek, <br />which will store water for release into Davie ditch and .to Rifle Creek <br />for diversion to the Grass Valley Canal. Water will also be pumped <br />from the Colorado Rive'r near Silt at the Silt pumping plant to serve <br />project lands. ' <br />The status of construction at June 30, 1966 was as follows: <br /> <br />Percent <br />complete <br />Silt pumping plant and pump oanaL__-'__u_______n.,.___-:-___..,__n_,.__n 71 <br />Rifle Gap Dam and road relocation________n_n___n__,._n___n___n__ '71' <br />Davie dItch, Grass Valley Canal rehabilitation, and Dry Elk .Valley <br /> <br />lateraL____ u __ __ _ _ _ __ __ __ __ c_ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ __ u u _ _ u _ _ _ _ _ _ _ _ __ 75 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.