Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Kev to Scenario ~ without Bookover Calculations <br /> <br />nent <br />each <br />pool. <br /> <br />In Scenario C there are no storage accounts in the perma- <br />pool. Rather, there are seven storage accounts (one for <br />agency) for 2625 a.f., all located in the flood control <br />The State would operate as in scenario A and B. <br /> <br />Col A: Agency name <br /> <br />Col B: Total amount of water in the flood control pool as allowed <br />by scenario C; Total amount in subsequent months are carried <br />forward from previous EOM balance. <br /> <br />Col C: Percent of PP evaporation assigned to each agency as <br />established for scenario C. <br /> <br />Col D: PP evaporation replacement, Col C (PP EVAP LOSS %) times <br />PP EVAP LOSS. <br /> <br />Note: Evaporation losses between PP and FCP are allocated as <br />follows: <br />(1) PP loss = PP content/total content X total loss. <br />(2) FCP loss = FCP content/total content X total loss. <br /> <br />Col E: FCP evaporation allocation to those agencies having stor- <br />age in FCP: If col B (BOM FCP ACCT) is less than or equals zero <br />then col E (FCP EVAP LOSS %) equals zero, otherwise col E (PCP <br />EVAP LOSS %) equals col B (BOM FCP ACCT) divided by the total of <br />all accounts with positive values in col B (BOM FCP ACCT). <br /> <br />Col F: FCP evaporation replacement. <br />times FCP EVAP LOSS. <br /> <br />Col E (FCP EVAP LOSS %) <br /> <br />Col G: Agencies contribution to storage as given in each agency's <br />basic data. <br /> <br />Col H: Release requirement met from reservoir but limited to what <br />the agency had in their agency account in col B (BOM FCP ACCT) . <br />If col B (BOM FCP ACCT) minus col D (PP EVAP LOSS AF) minus col F <br />(FCP EVAP LOSS AF) plus col G (INFLW) is greater than or equals <br />outflow from agency's basic data then col H (REL REQ'T MET) <br />equals outflow from agency's basic data, otherwise if col B (BOM <br />FCP ACCT) minus col D (PP EVAP LOSS Af) minus col F (FCP EVAP <br />LOSS AF) plus col G (INFLW) is less than or equals zero then col <br />H (REL REQ'T MET) equals zero, otherwise col H (REL REQ'T MET) <br />equals col B (BOM FCP ACCT) minus col D (PP EVAP LOSS AF) minus <br />col f (FCP EVAP LOSS Af) plus col G (INFLW). <br /> <br />Col I: Release requirement shortage: If col H (REL REQ'T MET) <br />equals outflow given in agency's basic data then col I (REL REQ'T <br />SHORT) equals zero, otherwise col I (REL REQ'T SHORT) equals <br />outflow given in agency's basic data minus col H (REL REQ'T MET). <br />The sum of col H (REL REQ'T MET) and col I (REL REQ'T SHORT) is <br />equal to release requested by the agency's basic data. <br />