My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01428
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:57 PM
Creation date
10/11/2006 10:24:18 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.700
Description
Miscellaneous Small Projects and Project Studies - Homestake Project
State
CO
Basin
Arkansas
Water Division
2
Date
10/29/1982
Author
various
Title
Documents related to the Homestake Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />34110.\ ,- (-I <br />(3) Alternative potential site locations and degree of feasibility of each; <br /> <br />(4) Proponents of proposal: <br /> <br />(a) Names, addresses and business of all local and other interests proposing <br />site of major expansion of a domestic water or sewage treatment system; <br /> <br />(b) Name and qualifications of the person(s) responding to the requirements <br />detailed in this regulation; <br /> <br />(5) Scope of proposal: <br /> <br />(a) Provide detailed engineering plans and specifications of proposal <br />including proposed system capacity and service area plans mapped at an appro- <br />priate scale; <br /> <br />.(b) Provide a description of all existing or approved proposed systems within <br />the development area and source development area; <br /> <br />(c) Detail the design capacity of each treatment system and distribution <br />or collection network in the community or development area and source development area; <br /> <br />(d) Specify the excess capacity of each treatment system and distribution <br />or collection network in the community or development area and source development area: <br /> <br />(e) Provide an inventory of total commitments already made for current water <br />or sewage services; <br /> <br />.. <br /> <br />(f) Detail the operational efficiency of each existing system in the develop- <br />ment area and source development area, including age, state of repair and level <br />of treatment; <br /> <br />.... <br /> <br />(g) Detail the source, rights and quality of existing water supply which <br />shall include a detailed statement of the proposed project's impact upon the total <br />dissolved solids and hardness of the Eagle River measured at Dowd Junction and Dotsero <br />and of the Colorado River .ahdtl1e Roaring Fork. River measured at..the Garfield-Eagle <br />County line, respectively. <br /> <br />(h) Detail water utilization including historic yield from rights and uses <br />by category such as agricultural, municipal and industrial and supply obligations <br />to other systems; <br /> <br />(i) Provide a description and detailed engineering plans and specficiations of <br />the proposed construction of structures, buildings, and improvements associated with <br />the project and the financial, environmental and social impacts thereof on the <br />communi ty or surrounding areas \'li thin the development area and source development <br /> <br />area; <br /> <br />- 43 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.