Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />t." .""": <<1'~1 <br />5H~';'~"" <br /> <br />All operational criteria simi lar to Kun 5H except <br />the maximum joint-use pool is 39,000 acre-feet <br />rather than the previous 19,500 acre-feet. <br />Compares the effect of Tri n i dad Project operat i on <br />to that of historical Model reservoir operation. <br /> <br />5K39 <br /> <br />Same as 5H39 except compares the effect of Trinidad <br />Project operat ion to that of rehabi 1 i tated Mode 1 <br />reservoir operation. <br /> <br />lHNOWBP <br /> <br />All operational criteria similar to Baseline study <br />except that no bypass releases are made from <br /> <br />Trinidad Reservoir to meet Highland and Ninemile <br />Canal demands in winter (November-March) months. <br />Compares the effect of Tri n i dad Project oprat ion <br />to that of historical Model reservoir operation. <br /> <br />lRNOWBP <br /> <br />Same as 1HNOWBP except compares the effect of <br />Trinidad Project operation to that of rehabilitated <br />Model reservoir operation. <br /> <br />All operational criteria similar to Run 5H except <br />that no bypass releases are made from Trinidad <br />Reservoir to meet Highland and Ninemi 1e Canal <br />demands in wi nter (November-March) months. <br />Compares the effect of Trinidad PrOject operation <br />to that of historical Model reservoir operation. <br /> <br />5HNOWBP <br /> <br />5RNOWBP <br /> <br />Same as 5HNOWBP except compares the effect of <br />Trinidad Project operation to that of rehabilitated <br />Model reservoir operation. <br /> <br />lHNOBP <br /> <br />All operat i ona 1 criteri a to Base 1 i ne study except <br />that no bypass releases are made from Trinidad <br />Reservoir to meet Highland and Ninemi1e Canal <br />demands in any month. Compares the effect of <br />Trinidad Project operation to that of historical <br />Model reservoir operation. <br /> <br />1RNOBP <br /> <br />Same as 1HNOBP except compares <br />Trinidad Project operation to that <br />Model reservoir operation. <br /> <br />All ope rat i ona 1 criteri a s i mil ar to Run 5H except <br />that no bypass releases are made from Trinidad <br />Reservoir to meet Highland and Ninemi1e Canal <br />demands in any month. Compares the effect of <br />Tri n i dad Project ope rat i on to that of hi stori ca 1 <br />Model reservoir operation. <br /> <br />the effect of <br />of rehabilitated <br /> <br />5HNOBP <br /> <br />5RNOBP <br /> <br />Same as 5HNOBP except compares the. effect of <br />Trinidad Project operation to that of rehabili- <br /> <br />19 <br />