Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~,JO <br /> <br />The computer model was also used to simulate several different operating <br />conditions over the 1925-1957 period used in the 1961 and. 1964 studies. <br />Each of these simulations compare the impacts on the inflow to John Martin <br />Reservoir under the selected conditions against a "without project" con- <br />di t i on with hi stori c mode 1 storages of 6,000 acre-feet and against a reha- <br />bilitated model storage of 20,000 acre-feet. The following is a brief <br />description of the condition simulated with the various computer runs. <br /> <br />lH <br /> <br />Description <br /> <br />Baseline study. Simulation of operation study <br />found in the Supplement. Compares the effect <br />of Trinidad Project Operation to that of <br />historical Model reservoir operation. <br /> <br />Run Name <br /> <br />lR <br /> <br />Same as 1 H except compares the <br />Project operation to that <br />Model reservoir operation. <br /> <br />effect of Trinidad <br />of rehabilitated <br /> <br />2H <br /> <br />A 11 ope rat i ona 1 criteri a s i mil ar to the Base 1 i ne <br />study except winter water (November - March) <br />stored in joint-use pool. Compares the <br />effect of Trinidad Project operation to that <br />of historical Model reservoir operation. <br /> <br />2R <br /> <br />Same as 2H except compares the effect of Tri ni dad <br />Project operation to that of rehabilitated <br />Model reservoir operation. <br /> <br />All operational criteria similar to Baseline <br />study except Mode 1 ri ght content transferred <br />to joint-use pool at end of October (subject <br />to space availability). Compares the effect <br />of Trinidad Project operation to that of <br />historical Model reservoir operation. <br /> <br />3H <br /> <br />3R <br /> <br />Same as 3H except compares the <br />Project operation to that <br />Model reservoir operation. <br /> <br />All operational criteria similar to Baseline <br />study except winter water (November - March) <br />stored in joint-use pool and Model reservoir <br />storage right content transferred to joint-use <br />poo 1 at end of October (subject to space <br />availabi lity). Compares the effect of Trinidad <br />Project operation to that of historical Model <br />reservoir operation. <br /> <br />effect of Trinidad <br />of rehabilitated <br /> <br />4H <br /> <br />4R <br /> <br />Same as 4H except compares the <br />Project operation to that <br />Model reservoir operation. <br /> <br />All operational criteria similar to Baseline study <br />except wi nter water (November - March) stored in <br /> <br />effect of Trinidad <br />of rehabilitated <br /> <br />5H <br /> <br />17 <br />