My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01333
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:32 PM
Creation date
10/11/2006 10:20:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
4/1/1980
Author
Six State High Plain
Title
Six State High Plains-Ogallala Aquifer Area Study - Energy Price and Technology Assessment - Energy Price Projections
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />commodity <br />elements. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />price projections for use as required in the various study <br />The energy price projections were used in the study as follows. <br />Study Element A-1. The state agricultural and farm level <br />research required price projections of petroleum and natural gas <br />products and electricity as inputs to the farm enterprise linear <br />programming models. <br />Study Element A-2. The state energy production impacts <br />research required price projections of crude petroleum and <br />natural gas at wellhead for estimating royalty payment income <br />and, in some instances, for projecting the future levels of <br />crude petroleum and natu ral gas production. <br />Study Element A-3. The economic analysis portion of the state <br />water resources evaluation and impacts research required pro- <br />jections of crude petroleum and natural gas prices as well as <br />refined petroleum product prices in order to estimate the total <br />output of the oil and gas production and refinery sectors in the <br />state input/output models. <br />Study Element B-1. The US Army Corps of Engineers required <br />estimates of inter-basin water transfer pumping power costs for <br />thei r studies on alternative water importation routes. Cost <br />estimates were developed for the Corps of Engineers consistent <br />with those reported herei they are documented in the Corps of <br />Engineers' reports on their water transfer route studies. <br />Study Element B-8. Analyses performed as part of the Energy <br />Price and Technology Assessment study element were carried <br />out using these energy price projectionsi in particular, the <br />assessment of energy production impacts on employment and <br />income in the Study Area the energy shortfall impacts analysis, <br />and the evaluations of new energy supply technologies used <br />these projections directly. <br /> <br />1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.