My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01318
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:29 PM
Creation date
10/11/2006 10:20:03 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.08
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
5/1/1994
Author
Western Area Power A
Title
Glen Canyon Dam Interim Operations - Estimated Net Expense - December 1993 through March 1994
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Average Base Case monthly purchase prices are estimated as follows: <br /> <br /> ENERGY PURCHASE PRICES <br /> Base Case Actual <br />Months Offpeak On peak Offpeak On peak <br />December 1993 $l6.34/MWh S24.07/MWh $16.44/MWh $24.08/MWh <br />January 1994 15.97/MWh 21. 80 /MWh 15.97jMWh 21. 86 /MWh <br />February 1994 16.16/MWh 24.24/1-1Wh 16.26/1-1Wh 24.2B/MWh <br />March 1994 16.43/MWh 23.48/MWh 16.52/MWh 23.49/MWh <br /> <br />, <br /> <br />r, <br /> <br />E. Economy Energy Sales Prices--Base Case and Actual <br /> <br />The sales price for the Base Case is determined with the help of <br />the Montrose Power Control Staff (Montrose). The estimate of <br />economy energy sales prices involve three steps: <br /> <br />.. <br />, <br />~: <br />~ <br />, <br />, <br /> <br />1. Identification of the range of market prices through review of <br />Montrose District Office Power Control staff's summaries of <br />then-current weekly market prices, as reflected in Western's <br />Weekly Reports to the Secretary. <br /> <br />",:. <br /> <br />>, <br />'t. <br /> <br />i,- <br /> <br />2. Review of the actual monthly economy energy sales summary and, <br />with the help of the Power Control staff, identification of <br />those forced sales directly associated with interim release <br />constraints. <br /> <br />,I <br /> <br />,.. <br />, <br /> <br />3. Assumption of expected sales price based on then-current <br />market conditions for that portion of sales identified in <br />step 2. <br /> <br />t; <br />,', <br />~.:,;. <br /> <br />In most instances, Western would have had the flexibility of <br />making all or most of the nonfirm energy sales during periods <br />when the value is greatest. For all months, the economy <br />energy sales prices under the Base Case is the same as the <br />actual sales price, reflecting no forced sales within this <br />period. <br /> <br />~; , <br />. <br />! ~ <br />ir <br /> <br />.:. <br />:..: <br />.... <br />,>, <br /> <br />.'.~ <br />?ii' <br />", <br />.:~ <br />'::. <br /> <br />,,-. <br /> <br />;'~ I <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.