Laserfiche WebLink
<br />I <br />I <br />I <br />, <br />r, <br /> <br />For the study period, 95 instances of deviations were found. Most of <br />the conditions were caused by more than one factor: (e.g., control area <br />regulation and imports/exports different than preschedule), therefore, <br />multiple variations can be explained by one anomaly. <br /> <br />The following table summarizes the causes and frequency of the 95 <br />deviations: <br /> <br />Primarv Causers) of Deviation <br /> <br />Control Area Regulation <br />Control Area Disturbance <br />CRSP Resource Availability <br />Aspinall Operations <br />Morrow Point Operations <br />Blue Mesa Operations <br />Imports/Exports Different than Preschedule <br />Other <br /> <br />Number Percent <br />Of Instances Of Events <br /> <br />~, <br /> <br />37/95 <br />10/95 <br />9/95 <br />4/95 <br />1/95 <br />2/95 <br />19/95 <br />13/95 <br /> <br />39 <br />11 <br />9 <br />4 <br />1 <br />2 <br />20 <br />14 <br /> <br />.' <br />~l <br />" <br /> <br />(. <br />. <br /> <br />" <br />" <br /> <br />v. <br /> <br />EXPENSES <br /> <br />, <br />'I <br />~ <br />~ <br />?- <br />, <br /> <br />i:. <br /> <br />A. Net Expense <br /> <br />The estimated net expense of interim releases for December 1993 <br />through March 1994 are summarized below: <br /> <br />t>, <br />,.' <br /> <br />~7 . <br /> <br />Net Expense <br /> <br />December 1993 <br />January 1994 <br />February 1994 <br />March 1994 <br /> <br />$551,942 <br />$373,668 <br />$465,858 <br />$343,725 <br /> <br />~.' <br /> <br />f: <br /> <br />:~. <br />~. <br /> <br />Attached are <br />by component <br />March 1994. <br /> <br />Tables 1 through 4 detailing the net expense analysis <br />for December 1993, January 1994, February 1994, and <br /> <br />f" <br />ft <br />~, <br />Ii <br />~ <br />~ <br />r~ <br />~ <br />tJ <br />t~ <br />".'J <br />" <br />. <br />~..; <br />~, <br /> <br />5 <br />