My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01307
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:30:25 PM
Creation date
10/11/2006 10:19:38 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power
Basin
Colorado Mainstem
Date
3/1/1960
Author
Kuljan Corporation
Title
Federal Transmission System for Colorado River Storage Project as Proposed by Preference Customers
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />I <br />'. <br />I <br />. <br />. <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />RECOMMENDATIONS - (Continued) <br />3. Applications for power be requested by the Department of <br /> <br />the Interior as soon as preference users can reasonably determine their <br /> <br />interest in view of market area and rates. <br /> <br />4. Power allocations be determined and announced by the De- <br /> <br />partment of the Interior as soon as possible after receipt of applications <br /> <br />therefor and after such public hearings as appear desirable or are re- <br /> <br />quested by interested parties. <br /> <br />5. Upon definite determination of allocations a program of <br /> <br />expenditures by years be presented to the Congress so that it may be in- <br /> <br />formed in advance of annual budget requirements to keep step with the <br /> <br />availability of Federal power and customer needs. <br /> <br />6. Due to the short time remaining before power is expected <br /> <br />to be available from project plants the Congress be requested as a mini- <br /> <br />mum to include in appropriations for fiscal year 1961 moneys to start <br /> <br />immediate construction of lines from Glen Canyon to Curecanti and from <br /> <br />Flaming Gorge to Oak Creek. <br /> <br />GROSS LOADS OF PREFERENCE CUSTOMERS <br /> <br />It is desired to state here that this report should in no way be <br /> <br />taken as an attempt to allocate Colorado River Storage Project power as <br /> <br />between the four Upper Basin States and Arizona or to exclude Nevada. <br /> <br />Acknowledging that there are conflicting views on this problem, an at- <br /> <br />tempt is here made to point out in the simplest way possible the potential <br /> <br />preference customer loads and the transmission system whereby they <br /> <br />might be served. A final system can only be devised when the Department <br /> <br />- 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.