Laserfiche WebLink
<br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ASSUMED DISTRffiUTION OF PROJECT POWER <br /> <br />In any attempt to depict a proposed transmission system it is <br /> <br />necessary to assume loads and locations. For this purpose only and, to <br /> <br />repeat, not in any attempt to make power allocations, the following tabu- <br /> <br />lation has been prepared as a basis for present transmission line consid- <br /> <br />erations. <br /> Megawatts <br />State 1970 1975 <br />Colorado 173 385 <br />New Mexico 159 234 <br />utah 166 217 <br />Wyoming 8 34 <br /> Sub-totals 506 870 <br />Arizona 549 240 <br /> Totals 1055 1110 <br /> <br />1980 <br />570 <br />263 <br />224 <br />53 <br />1110 <br />o <br />1110 <br /> <br />In the above assumed distribution of project power, subject to <br /> <br />change due to final allocations, Arizona's requirements have been taken <br /> <br />arbitrarily as the amount of project power remaining after those of the <br /> <br />four Upper Basin States have been satisfied in 1970, as 240 megawatts in <br /> <br />1975 and as zero in 1980. The transmission system proposed is suitable <br /> <br />with minor variations for loads within the above variations. <br /> <br />- 9 - <br />