Laserfiche WebLink
<br />SUMMARY SHEETS <br /> <br />Dolores Project <br /> <br />LOCATION <br /> <br />Montezuma and Dolores Counties of southwestern Colorado in the Upper <br />Colorado River Basin. <br /> <br />PLAN <br /> <br />The Dolores Project would develop water from the Dolores River for irri- <br />gation, municipal and industrial use, power production, recreation, and <br />fish and wildlife. It would also provide flood control and cultural re- <br />sources mitigation and would aid in area economic redevelopment. Service <br />would be provided to the Dove Creek and Montezuma Valley areas in the <br />Dolores Water Conservancy District and the Towaoc area, a part of the Ute <br />Mountain Ute Indian Reservation. <br /> <br />Primary storage for all project purposes would be provided by McPhee <br />Reservoir on the Dolores River. Secondary storage for municipal and in- <br />dustrial water would be provided by Monument Creek Reservoir which would <br />receive water diverted from McPhee Reservoir. Dawson Draw Reservoir <br />would be constructed specifically for fish and wildlife and would be <br />supplied primarily from irrigation return flows. <br /> <br />Irrigation water would be provided for full service land in the Dove <br />Creek and Towaoc areas and for supplemental service land in the Montezuma <br />Valley area. Water for the Dove Creek area would be pumped from McPhee <br />Reservoir by the Great Cut Pumping Plant and conveyed through the Dove <br />Creek Canal and its branch, the South Canal. Water for the Towaoc area <br />would be conveyed from the reservoir in the Dolores Tunnel and the <br />Dolores and Towaoc Canals. Buried pipe lateral systems would distrib- <br />ute the water to farms in both the Dove Creek and Towaoc areas. The <br />Montezuma Valley area would be served by the Dolores Tunnel and Canal and <br />an existing gravity distribution system. <br /> <br />Municipal and industrial water supplies for Cortez and Towaoc would be <br />stored in McPhee Reservoir and delivered to the towns by the Dolores <br />Tunnel and Canal and the Cortez-Towaoc Pipeline. Supplies for Dove Creek <br />and surrounding rural areas would be conveyed in the Dove Creek Canal <br />and reregulated in Monument Creek Reservoir. The water users would be <br />responsible for any required treatment and distribution facilities. <br /> <br />Powerplants would be located on McPhee Dam and the Towaoc Canal to <br />generate power that would enter the Colorado River Storage Project power <br />transmission system. The McPhee Dam facility would operate year-round on <br />fishery releases from McPhee Reservoir, while the Towaoc Canal Plant <br />would operate from April to October on the irrigation water supply con- <br />veyed through the canal. <br />