Laserfiche WebLink
<br />15 <br /> <br />pc€paration of his final report. The principal elements of <br /> <br /> <br />each alternative will be described in summary fashion with <br /> <br /> <br />enough analysis to understand the general objective and <br /> <br />impact of each, but without either endorsement or adverse <br /> <br />comment on any of the possible alternatives. <br /> <br />III. RESOURCE STUDY REQUIREMENTS <br /> <br /> <br />A. Physical characteristics <br /> <br /> <br />Data will be compiled on: <br /> <br /> <br />1. Water yields of streams by drainage basins in <br /> <br /> <br />the public land stat~s and the relationship of <br /> <br /> <br />public lands to these yields (1961-66 average). <br /> <br /> <br />2. Acreages of land by watershed Productivity <br /> <br /> <br />classes, by agency. by state as of the most <br /> <br /> <br />recently available data. <br /> <br /> <br />3. Acreages of land treated and. expenditures on <br /> <br /> <br />public lands for corrective watershed measures <br /> <br /> <br />by major land use (grazing. timber, etc.) by <br />program (soil and water. P.L. 566, Act of August <br />4, 1954, 68 Stat. 666. as amended. 16 V.S.C. <br />1001 etc.) by kind, by agency. by state for <br />the 1946-1966 period. <br />