My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01283
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:21:13 PM
Creation date
10/11/2006 10:19:23 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8059
Description
Section D General Studies-State Water Plan
State
CO
Date
1/1/3000
Title
State Water Plan Reference Data- A Proposed Study Plan-Water
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />14 <br /> <br />B. Identification of Problem Areas and Matters Mcritir.~ <br />Particular Consideration <br /> <br /> <br />Identify all problem areas and metters appearing t~ <br /> <br /> <br />warrant particular consideration by the CCITmllssion as indicated <br /> <br /> <br />by review of the existing legal systems, with sufficient <br /> <br /> <br />explanation to permit understanding of the issues and factors <br /> <br /> <br />involved. <br /> <br /> <br />C. Identification of Alternatives <br /> <br /> <br />The contractor will prepare a listing of alternatives <br /> <br /> <br />to the existing legal system, either modifications of the <br /> <br /> <br />present system or wholly new approaches, which have been <br /> <br /> <br />proposed from various sources, e.~.. legislative proposals, <br /> <br /> <br />past and present; federal agencies; planning organizations; <br /> <br /> <br />groups of public land users; legal and public land management <br /> <br /> <br />commentators, and other reputable sources. The list shculd <br /> <br /> <br />also include any other possible alternatives which the contractor <br /> <br /> <br />may feel are appropr.iate for Commission consideration in light <br /> <br /> <br />of his review of the existing system. <br /> <br /> <br />This listing is to be provided to the Commission as soon <br /> <br /> <br />as possible, but no later than when review of the existing <br /> <br /> <br />system is completed and prior to the contractor initiating the <br /> <br />~ I <br /> <br />3~6~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.