Laserfiche WebLink
<br />li.p\iil{TION\NlI \lAINTENANCE <br />I., L,..~.. <br /> <br />l7 <br /> <br />TARLE 5 <br /> <br />ACTliAL <:051' TO METROPOLITAN WATER D1,;TRICr OF POWER <br />UNDER TIlE BOULDER CANYON I'ROJE<:T AllJUSTMENT ACT <br /> <br />OPERATING Gr{)!!,~ OhligBlion <br />y.t:......R ENI.;nCy Gll"EIL\TIOt, TtJT.~L <br />1938,1939 ..$ 901../85..3" $ 317,219.9\ $1.218.70:1.2-1 <br />1939-1940 1.252,73./.08 113.372.32 1.Y;6,1(J6..~1 <br />19./0,19./1 1,62S,717.96 17f.J.2R6.!P. 1.8DS.OO..J..H <br />19>1,1942 1,7.39,127.0.1- 2.>3,9:13",'\ 1.973,06.5.58 <br />1942,1943 1,770,843.20 3Rfl,799.62 2,1.'59.6..1,2.82 <br /> ---- --- -- <br />TOla] .. u $7,289,907,61 .$1.232.610.H7 ' $8..\22,52./.48 <br /> Crt"dil~ fur Resalt'.,;; <br />1938,]939 I 25,079,67 $ 7,./90.70 $ 32,S 70..} 7 <br />1939,191!1 4,(.1.,676.69 :37..\00.:33 .'112.177.02 <br />1940,19'/1 38.1,114.60 37,59',99 .170,709,59 <br />1941,19~2 276,574-.8<) 63,62~.17 340.2U3,06 <br />19./2,]9<1-1 ],483.138.25 ,361,93./,21 1.BSO,072A6 <br /> -- --- <br />TOlal .. $2.64i,S8-l.lO $ S:iR.1-l8..tn $J.205,73Z.s0 <br /> Net CO~I flf Powc-r <br />1938,1939 u' .$ 876..105,66 5 ,109,729,21 $LI86.13./.87 <br />1939,19.j(] 778,057,39 75,871.99 853.929..tB <br />]9./0-19./1 .u I,N2.603.3b 91,691.4f.J 1..334.294.8':; <br />]941,1942 1,462,552.1;; 170.310.37 1.632.862.,1)~' <br />]9./2,1943 282,104.05 26,865-A1 309,570.:16 <br />T0131 . ...'~,6t2,32.'.51 $ 67 H6HA7 $:",16,791.9" <br /> <br />/ <br />Delivery of power <br /> <br />Delivery of electric energy from the District's ~ystem to Basic <br />Magnesium, Incorporated, was commenced June 6, 1!l42, the de- <br />mand increasing to 15g,500 kw at the end of .June 1943, Such <br />energy was supplied from Boulder to the extent permitted by the <br />generating capability of the units assigned to the District's use <br />and remaining after supplying the power requirements of the Dis- <br />trict. The supply was supplemented by power from the Parker <br />power plant after that plant WllS placed in operation on December <br />13, 1942, The total use of Boulder energy by Basic Magnesium, <br />Incorporated, during the contract year ending May 31, 1\\43 was <br />472,421,049 kwhr which, under the Defense Plant Corporation's <br />contract to Jlurchase a minimum of 1,100,000,000 kwhr during the <br />year, left II balance of 627,578,951 kwhI' to be paid for by Defense <br />Plant Corporation. although unused, The demand of the mag- <br />nesium metallurgical plant during the month of .Iune 194:3 reac,hed <br />105,884,021 kwhr and was increasing at the end of the fiscal year, <br />Energy is being taken at a load factor in exces;; of 95 per cent. <br />