|
<br />21i0
<br />
<br />14
<br />
<br />MET R 0 POL I T ,\ N \V ,\ T E R D 1ST R I c: T
<br />
<br />TABLE 3
<br />
<br />METROPOLITAN WATER DISTRICT OBLIGATIONS, USE, AND RESALE
<br />FOR CREIJIT OF THE DISTRICT OF BOULDER FIRM ENERGY
<br />IN KILOWATIHOIIRS
<br />
<br />QpEil,nl;-.oc
<br />YEAR lJr-lJSU) AND
<br />JUNE I-MAY 31 Ollllt;ATIClN US[D IIY M. W. II. RESOLD :"OT llESOL!1
<br />1938,1939 768,959,S~4 42,848,400 15,386,300 7 ]0,724,824
<br />1939,19.w .. 1.0+5,414,242 227.368.669 761,238,931' 56,806.642
<br />1940-1941 ,1,270,861,054 142,9)8,54) 176,804,176 95 l.l38,?,3 7
<br />1941,1942 ..1,4%,380,088 44,017,660 582,078,397' R69.2IH.O:i 1
<br />1942.191-3 .. 1,510,9.\8,365 60,623..539 ],4.10,334,826" 0
<br /> ---
<br />TOlal . 6,09J ,573.27.3 .117,776,809 2,98.\,8~2.630 2..187,953,8.' I
<br />
<br />lIncludes 68~,216,901) kwhr taken r,y S<.llltll<:'rn Cnliiu(n;a EJi5(m Co. a! h mill pt'T I;\\'Jlr.
<br />~Inc\udes 486,126,721 kwhr lakell hy c..lher a\lottces al i"<"conu;n.\" rate.
<br />~IlIclude5 2S6,239,SSi kwhr l<lken ny ot}rer 1I11()Itl;'eS .;It .\eCcn:l;d'Y (::lIe- :llld v2i,3i~.'i.;] kwllr
<br />11;Jil\ for by Ddcn5~ Plant CorporatilJn bill not l\~(,''1 ll~' nasi.: ~lagncsi\\rn, lnl:.
<br />
<br />The rates under the Boulder Canyon Project Adju8tment Act
<br />for falling water for firm and secondary energy, including the
<br />contract year June 1, ]fl43 to May :n, 1944, have been as follows;
<br />
<br />CO'llTHAC1' 'H.'!"Jl,
<br />1937,38
<br />ill)
<br />;0
<br />41
<br />,J2
<br />43
<br />44
<br />
<br />RATES IN MII.LS rER KWH"
<br />FIRM SECOND/loRY
<br />
<br />...U63
<br />.U63
<br />,U63
<br />.. U63
<br />U6,'
<br />1.172
<br />,1,190
<br />
<br />0,340
<br />0,340
<br />0,340
<br />0.340
<br />0,3,10
<br />O,3~6
<br />0,357
<br />
<br />In addition to the rates for falling water each allottee pays the
<br />generating cha.'ges of the equipment in the Boulder power plant
<br />assigned to its Use, including amortization of the cost of the equip-
<br />ment with interest at 3 per cent per annum, replacement costs, and
<br />actual expenditures for operation and maintenance, In case of
<br />joint use of equipment by several contractors the generating
<br />charges are allocated in proportion to the kilowatthours gener8ted
<br />for each of the several joint users.
<br />The District's Boulder power supply will exceed its require-
<br />ments until the demand for water reaches approximately 700,000
<br />acre feet pel' year, and the problem of recouping the co,t of the
<br />unused energy is of great importance to the District.
<br />Figure] shows graphically the District's actual and estimated
<br />use of electrical energy, its obligation to take Boulder energy and
<br />tbe probable lIse of energy froJll other sou rces,
<br />
|