My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01185
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:40 PM
Creation date
10/11/2006 10:14:39 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.500.20.A
Description
Colorado River Operations
Basin
Colorado Mainstem
Date
8/15/1986
Author
UCRC
Title
Draft - Upper Colorado River Commission Action Related to Operation of the Colorado River Reservoir System
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'operating criteria' suggested by the Commission deals only with the <br /> <br />appropriate date for equalization of active storage, it does not appear that <br /> <br />there is need at this time for a formal meeting of State and Federal repre- <br /> <br />sentatives to review the 'operating criteria. III In their comments the <br /> <br />Commission and the States maintained that the September 30 date for equal- <br /> <br />izing the active storage in Lake Powell with the active storage in Lake Mead <br /> <br />is too rigid and the criteria should provide for a period over which equal- <br /> <br />ization should occur. "This period might be 30-60-90 or more days. . ." <br /> <br />(Comments and Recommendations of the Upper Colorado River Commission on <br /> <br />Criteria for Coordinated Long-Range Operation of Colorado River Reservoirs <br /> <br />dated August 9, 1975; refer also to the section in the instant report on <br /> <br />tlequalization.") <br /> <br />The Secretary of the Interior in his letter of January 13, 1976 with <br /> <br />attached noticed to be published in the Federal Register indicated Of. the <br /> <br />Secretary has the authority to 'equalize storage' within a reasonable period <br /> <br />of time before or after September 30; the language of Article 11(3) of the <br /> <br />operating criteria is aimed at establishing an operational objective." He <br /> <br />also concluded: "Most comments, including those received from each of the <br /> <br />Colorado River Basin States, suggest that present conditions do not justify a <br /> <br />formal meeting to review the criteria, and therefore, no formal meetings are <br /> <br />planned." <br /> <br />The second review was initiated in July of 1980. The expressed need for <br /> <br />a review by the Department of the Interior was to optimize the utilization of <br /> <br />water in an essentially full reservoir system. Specific parts of the <br /> <br />Criteria which could be refined were listed in a September 17, 1980 letter <br /> <br />from N. W. Plummer, the Regional Director of the Upper Colorado Region of the <br /> <br />Bureau of Reclamation, and included: <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.