My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01174
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:38 PM
Creation date
10/11/2006 10:14:25 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.900
Description
South Platte Projects - Bear Creek
State
CO
Basin
South Platte
Date
1/1/1968
Author
USACOE
Title
Bear Creek Basin, South Platte River and Tributaries, Colorado, Wyoming and Nebraska - Letter from the Secretary of the Army
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Structural facilities would be provided in lieu of relocations to accom- <br />modate the flow requirements of three water supply canals. The recom- <br />mended project includes lands and facilities for wildlife management <br />and recreation purposes. The District Engineer finds that the plan of <br />improvement is an essential element of a comprehensive flood control <br />system for metropolitan Denver and the upper South Platte River basin, <br />and that the improvements, in combination with the existing Cherry <br />Creek project and the Chatfield project presently under construction, <br />would enhance the welfare and economic stability of the region by <br />affording security against disastrous floods. He also finds that the <br />associated recreational development of the proposed project would <br />materially enhance opportunities for water-based recreation and fill <br />a need for such facilities on the basis of current and future needs of <br />a rapidly growing population. <br /> <br />"i <br /> <br />" <br /> <br />8 . The District Engineer recommends that the Chief of Engineers <br />be authorized to participate in construction and relocation of transpor- <br />tation facilities and utilities in advance of project construction to <br />avoid increased costs for relocations, that following authorization of <br />the project, detailed site investigations and design be made for the <br />purpose of accurately defining the proj ect lands required and that, <br />subsequently, advance acquisition be made of such title to such <br />lands as may be required to preserve the site against incompatible <br />developments. <br /> <br />9. The Division Engineer concurs generally in the plan of <br />improvement recommended by the District Engineer. However, he is <br />of the opinion that a contingency item in the amount of $ 7 ,800,000 <br />should be included in the project cost to permit modification of the <br />spillway design and purchase of additional lands should detailed <br />subsurface exploration at the site dictate such action. Also. he feels <br />that the estimated cost for the plan recommended in the report should <br />be further increased by $1,000,000 to cover the possible cost of <br />remedial work in connection with the abandoned mine workings known <br />to be under the abutments of the proposed dam. <br /> <br />.., <br /> <br />10. Economic evaluation.--Based on 1966 price levels, the <br />District Engineer estimates the first cost of the improvement at <br />$21,000,000, of which $20.481,500 would be Federal and $518,500 <br /> <br />24 <br /> <br />,; <br />
The URL can be used to link to this page
Your browser does not support the video tag.