Laserfiche WebLink
<br />6. Subsequent to the recommendation by the Board, the State <br />of Colorado and the Bureau of Outdoor Recreation completed their <br />study of recreation needs in the Denver area and the potential for <br />an expanded development for recreation use to include the Soda <br />Lakes and Mount Glennon upstream from the proposed Mount Carbon <br />reservoir. The reporting officers in cooperation with the <br />regional offices of the Bureau of Outdoor Recreation and the <br />Bureau of Sport Fisheries and Wildlife have given further con- <br />sideration to the enlarged recreation development. <br /> <br />.' <br /> <br />7. After additional study the reporting officers recommend a <br />plan for optimum recreation development that has been recommended <br />by the Bureau of Outdoor Recreation of the Department of the Interior. <br />This plan to enhance the recreation potential of the area would <br />involve the acquisition of 758 acres of ,land for recreation purposes <br />or 633 acres more than contemplated in the original recommendation by <br />the reporting officers and approved by the Board. The general loca- <br />tion of the proposed Mount Carbon Reservoir and the additional lands <br />for the expanded recreation development is indicated in the supple- <br />mental report. The first costs for the lands, facilities, and water <br />purchases required in addition to those initially recommended by the <br />reporting officers are estimated to be about $2,817,000 and the annual <br />charges are estimated to be about $230,000. The additional annual <br />recreation and fish and wildlife enhancement benefits are estimated <br />to be about $642,000. The benefit-ccst ratio for this additional <br />increment is 2.8. <br /> <br />.' <br /> <br />8. The first cost of the modified plan consisting of a multiple- <br />purpose dam on Bear Creek and the enlarged recreation development is <br />estimated to be $32,617,000. The annual charges on the basis of the <br />current 3-1/4 percent interest rate are estimated to be about $1,423,000 <br />including $235,000 for operation, maintenance, and major replacements. <br />The annual benefits are estimated to be about $3,227,000, including <br />$2,412,000 for flood control and $815,000 for recreation and fish and <br />wildlife enhancement. The benefit-cost ratio is 2.3. <br /> <br />.' <br /> <br />. <br /> <br />9. I believe that the intent of the Federal Water Project Recrea- <br />tion Act (PL 89-72) is that all separable costs allocated to recreation, <br />including costs for water, be considered in the report analysis and <br />ultimately in the sharing of project costs between the Federal Govern- <br />ment and non-Federal public bodies. Therefore, the cost for acquiring <br />water for the proposed Bear Creek project has been included as a <br /> <br />3 <br /> <br />96_1260-68-3 <br />