Laserfiche WebLink
<br /> <br />4 <br />U <br />II If' <br />.:) <br />':) <br /> t. .) <br />II c) <br /><:::;;> <br />II <br />II <br />. <br />II <br />II <br />II <br />. <br />I <br /> <br />2. Project Authorization <br /> <br />" <br /> <br />Studies for ,the Closed Basin Division, San Luis Valley Project, were <br />authorized in 1940. Also authorized at that time were studies for the <br />Conejos', Rio Grande, and Weminuche Pass, which are other divisions of <br />the San Luis Valley Project. It should be pointed, out that the Closed <br />Basin Division is considered a separate project, and the completion of <br />this project does not imply that any of the following described potential <br />projects will be 'carried to completion. <br /> <br />In 1951 construstion..9f. Platoro Dam and Reservoir, was completed, on the <br />Conejos River, a Rio Grande tributary located downstream from the pro- <br />ject area. The principal purpose of the Conejos Division was to store <br />irrigation water for the Conejos Water Conservancy District lands located <br />downstream; but presently the reservoir only stores floodwaters (see <br />section A-B). <br /> <br />Prior to World War II the Rio Grande Division was authqrized to construct <br />Wagon Wheel Gap reservoir on the Rio Grande above the project area for <br />irrigation, flood control, and power generation. However, increased <br />postwar costs precluded its construction; and to date, Wagon Wheel Gap <br />res~rvoir has not been constructed (see section A-B). <br /> <br />The Weminuche Pass Transmoantain Diversion to bring 20,000 acre-feet of <br />San Juan River Basin waters into the Rio Grande above Wagon Wheel Gap <br />reservoir was also recmmnend~d for construction prior to World War II, <br />but the entire diversion plan was subsequently found to be infeasible. <br /> <br />The 1940 study authorization also stated that the construction of the <br />Closed Basin Division should be contingent on (1) a conclusive finding <br />of justification for draining the project on the basis of cost and the <br />quantity and quality of the water to be secured and (2) adequate arrange- <br />ments for maintenance of the drain. Several studies have been conducted <br />during the intervening years to resolve these uncertainties. These <br />studies are--Reconnaissance Report, August 1956; Feasibility Report, <br />July 1963; and Reevaluation Statement, May 1970. The Feasibility Report <br />and Reevaluation Statement were published as House Document No, 91-369, <br />9lst Congress, 2d Session which was the basis for the current project <br />authorization. Public Law 92-514, dated October 20, 1972, authorized <br />the Secretary of the Interior to: <br /> <br />. construct, operate, and maintain the closed basin division, <br />San Luis Valley project, Colorado, . . <br /> <br />A final environmental statement (FES 71-14) was <br />on Environmental Quality on September 21, 1971. <br /> <br />filed with the Council <br />Changes in the project, <br /> <br />A-5 <br />