My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01118
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:24 PM
Creation date
10/11/2006 10:11:51 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - EPA
State
CO
Basin
Statewide
Date
1/9/1973
Author
EPA
Title
EPA - Water Strategy
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />0027n <br /> <br />k.~ <br />'if;~ <br /> <br />'i!~ <br />'l..:'kSt <br /> <br />8 <br /> <br />The \,c,::er stratc(jY L, a choice olE timing, phClsinrr ",,",.1 <br />relative priorities in iP'!plementing siections of the N~ter <br />Bill. Its philosophy is to fill in i~form~tion gaps \<"here <br />these are critical and to proceed \.:ith a strong program immediate. <br />~here the Agency is sure of its groun~. Thus there is phasing <br />to allo~ for the development of furth~r water quality data, <br />final effluent guidelines, and certain new programs (e.g., ocean <br />dumping, non-point). But the strategy calls for major <br />portions of a national pollution abatement program to begin <br />at once: <br /> <br />the permitting of selected major dischargersi <br /> <br />_ planning and monitoring in the basins where <br />.. pollution is concentrated: <br /> <br />grants for municipal plant construction: <br /> <br />enforcement against violators. <br /> <br />The sequence is explained below in words, and in Table A. <br /> <br />Inland surface waters shall be divided immediately into <br />hydrologically discrete segmen~s as directed in 303 regulations. <br />At the same time the States shall make a preliminary deter- <br />mination, for eaoh segment, whether the ~pplication of best <br />practicable technology to industries and secondary treatment <br />to municipal plants will result in meeting 1977 water quality <br />standards, or whether standards themselves will dictate the <br />necessary level of eff.luent reduction. Where there is doubt. <br />a segment shall be considered a water quali~y limited segment, <br />subject to later.re-classification as more di'tta are generated. <br /> <br />Where a segment .is effluent limited, the State where it <br />i~ found will deve~op a management-type 303 pla~ listing the <br />d~schargers border~ng that segment and the order in which <br />permits will be issued to them. It is not necessary for a <br />plan to be completed and approved prior to issuance o~ a per- <br />mit: however, the issuance should be consistent with oriorities <br />in the St.i'lte Discharge Control Priority List, once it-is develope <br /> <br />'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.