My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01115
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:24 PM
Creation date
10/11/2006 10:11:45 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.126.J
Description
San Miguel Project
State
CO
Basin
San Juan/Dolores
Water Division
4
Date
12/5/1979
Title
San Miguel Project: Alternative Plans of Development
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.''1';,0 <br />i;J,j.' <br /> <br />C"'; <br /> <br />- <br />.... ~- <br /> <br />~ <br /> <br />.:~;) <br /> <br />SAN MIGUEL PROJECT <br /> <br />Irrigation Benefits dnd Repayment <br /> <br />In April of 1976 a Farm Management Survey was conducted in the San <br /> <br />Miguel Project area. Interviews were held with 33 of the farmers <br /> <br />in the area to obtain data relating to their current farming and <br /> <br />ranching operations. This data included cropping patterns, crop <br /> <br />yields, farm sizes, type and number of livestock, livestock turn-off <br /> <br />rates, machinery ,used, etc. This data was tabulated and used in the <br /> <br />farm budget analysis to measure project benefits and repayment ability. <br /> <br />Benefits; The project irrigation benefits were determined by com- <br /> <br />paring farm budgets representing the with project condition to those <br /> <br />representing the without project condition. The farm budget data <br /> <br />for the without project condition was obtained from ,the Farm Management <br />! <br />Survey and reflects current conditions. Data for the with project <br /> <br />farm budgets was obtained from local agricultural leaders and com- <br /> <br />. <br /> <br />parisons with similar areas having a full water supply. Prices in <br /> <br />both the with and without project conditions are 1978 current normal- <br /> <br />ized prices and were established under the guidelines given by the <br /> <br />,Water Resource Council. The increased net income projected under <br /> <br />the with project condition for the project area is the benefit of <br /> <br />project irrigation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.