My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01110
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:23 PM
Creation date
10/11/2006 10:10:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100.10
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1995
Title
Colorado River Basin Salinity Control Project - Report on Public and Agency Review of the Program and Implementation Plan for the Basinwide Program - Discussion Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. WilY .....UGIIIIC'U rIUJt::l,;L::i <br /> <br />These units have completed full planning and environmental compliance. They <br />may only require minor updates and agreements to be ready to rank and <br />implement. There may also be USDA units which have completed NIlPA compliance <br />that are also fully qualified. <br /> <br />~ <br />..", <br />C.::: <br />OJ <br /> <br />Grand Valley Unit - deferred increments will qualify to compete in new <br />program. Planning and NIlPA compliance covere entire project area. <br /> <br />Lower Gunnison East Side Laterals - Full planning and current NIlPA compliance <br />has been completed. <br /> <br />Price San Rafael Rivers unit - Full planning and current NEPA compliance has <br />been completed. <br /> <br />San Juan River Unit <br />and NEPA compliance. <br />of investigation. <br /> <br />The Hammond Project Area has completed fully planning <br />Other areas in the basin are in the preliminary stages <br /> <br />Partially Qualified Projects <br /> <br />These units have a significant amount of planning completed but may require <br />additional work to define costs, complete (update) environmental compliance <br />documente, or be approved by Congreee ("off ceiling Projecte") <br /> <br />Big Sandy. River Unit - This unit has been studied, but was not cost-effective <br />as a federally funded project. However, with local cost sharing, agricultural <br />improvements could become competitive. <br /> <br />Glenwood Springe Unit - coet schedules have been negotiated but 'environmental <br />compliance has yet to begin. This would be an "off ceiling" project and will <br />require Congressional approval under the section 202(a) (6) review <br />requirements. <br /> <br />paradoz Valley Unit (Privatized enhancements by Dew Chemical) - Dow Chemical <br />is investigating ways to improve injection rate at Paradox. Treatment would <br />improve injection rate of ealt by about 30-percent. Costs need to be <br />negotiated, but existing NEPA compliance would cover propoeal. <br /> <br />Uinta Basin Unit - this unit would require updating the Final Environmental <br />Impact Statement <br /> <br />~9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.