Laserfiche WebLink
<br />II <br />I <br /> <br />OUTLINE OF VOLUME I - REPORT <br />(continued) <br /> <br />Section <br />Number <br /> <br />Section and Subsection Titles <br /> <br />VIII <br /> <br />FIELD INVESTIGATIONS <br />A. General <br />B. Inspection of Alternative Water Supplies <br />C. Environmental <br />1. General <br />2. Dam, Reservoir and Conveyance Channel <br />D. Archaeological <br />E. Topography and Surveys <br />1. Previous Surveys <br />2. Current Surveys <br />F. South Platte River Capacity <br /> <br />I <br />1 <br /> <br />,1 <br /> <br />:: <br /> <br />IX <br /> <br />GEOLOGY. SUBSURFACE INVESTIGATIONS, AND <br />MATERIALS TESTING <br />A. General <br />B. Geology <br />C. Dam Site Investigations <br />D. Conditions at Project Features <br />1. Dam <br />2. Service Spillway and Auxiliary <br />Spillway <br />3. Outlet Works <br />E. Construction Materials <br />1. General <br />2. Borrow Area A <br />3. Borrow Area B <br />4. Borrow Area D <br />5. Borrow Area G <br />6. Riprap Quarry <br />7. Concrete Aggregate <br />F. Material Testing <br />1. General <br />2. Impervious Materials <br />3. Shell Materials <br />4. Coarse Sands <br />5. Foundation Materials <br />G. Future Investigations <br /> <br />I <br />: <br /> <br />I <br /> <br />\i <br />~, <br /> <br /> <br />Page <br />Number <br /> <br />VIII-l <br />VIII-l <br />VIII-l <br />VIII-l <br />VIII-l <br />VIII-2 <br />VIII-3 <br />VIII-3 <br />VIII-3 <br />VIII-4 <br /> <br />IX-l <br />IX-l <br />IX-2 <br />IX-3 <br />IX-3 <br /> <br />IX-4 <br />IX-4 <br />IX-4 <br />IX-4 <br />IX-5 <br />IX-5 <br />IX-5 <br />IX-6 <br />IX-6 <br />IX-6 <br />IX-6 <br /> <br />IX-7 <br />IX-7 <br />IX-8 <br />IX-8 <br />IX-9 <br /> <br />., <br /> <br />','1- <br /> <br />.l <br />'-il <br /> <br />" , <br /> <br />