My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01061
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:09 PM
Creation date
10/11/2006 10:07:40 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.913
Description
South Platte Projects - Spinny Mountain
State
CO
Basin
South Platte
Date
2/1/1974
Author
RW Beck and Assoc.
Title
Spinney Mountain Project Feasibility Report Vol 1 - Report (3 Volume Set)
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;e <br />.er <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br />2 <br /> <br />-1 <br />-2 <br />-2 <br />-2 <br />-3 <br />.3 <br />.4 <br />.4 <br /> <br />.5 <br />-6 <br />.6 <br />6 <br /> <br />7 <br /> <br />7 <br />8 <br />8 <br />8 <br />9 <br /> <br />9 <br /> <br />OUTLINE OF VOLUME I - REPORT <br />(continued) <br /> <br />,Section <br />'NUmber <br /> <br />Section and Subsection Titles <br /> <br />V <br /> <br />GENERAL OPERATION OF THE WATER SUPPLY PROJECT <br />A. General <br />B. Coordination with the Denver Water <br />Board <br />C. Coordination with Colorado Springs <br />D. South Platte River Capacity <br /> <br />VI <br /> <br />PROJECT RESERVOIR OPERATION STUDIES <br />A. General <br />B. Supply System Computer Model <br />1. General <br />2. Description of the System <br />Components <br />C. Reservoir Operation Criteria <br />1. General <br />2. Satisfying Demand <br />3. Homestake Reservoir <br />4. Turquoise Reservoir <br />5. Spinney Mountain Reservoir <br />D. Results of Operation Study <br />1. General <br />2. Reservoir Operation <br />3. Spills <br />4. Demand Not Supplied <br />5. Storage Appropriation <br />E. Project Yield <br />F. Reservoir Size <br />1. Gener al <br />2. Dead Storage <br />3. Siltation <br />4. Reserve Storage <br />5. Reservoir Regulation <br />6. Final Reservoir Size <br /> <br />VII <br /> <br />PROJECT CONDITIONS <br />A. Project Location <br />B. Topography <br />C. Climate <br />D. Hydrology <br />1. Flood Flows <br />2. Siltation <br />E. Population and Land Use <br />F. Public Lands <br /> <br />Page <br />Number <br /> <br />V-I <br /> <br />V-I <br />V-2 <br />V-3 <br /> <br />VI-I <br />VI-2 <br />VI-2 <br /> <br />VI-2 <br />VI-6 <br />VI-6 <br />VI-6 <br />VI-7 <br />VI-7 <br />VI-7 <br />VI-8 <br />VI-8 <br />VI-8 <br />VI-9 <br />VI-9 <br />VI-lO <br />VI-lO <br />VI-ll <br />VI-ll <br />VI-ll <br />VI-ll <br />VI-12 <br />VI-13 <br />VI-13 <br /> <br />VII-l <br />VII-l <br />VII-l <br />VII-l <br />VII-l <br />VII-2 <br />VII-2 <br />VII-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.