My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01056
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:29:08 PM
Creation date
10/11/2006 10:07:38 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River General
State
CO
Basin
Gunnison
Water Division
4
Date
2/13/1992
Author
Unknown
Title
Gunnison River Basin Planning Model - Existing Model Review
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />. <br /> <br />'I <br />I . <br /> <br />oa0338 <br /> <br />" <br /> <br />- / <br /> <br />~rf <br />1~~Ye. <br /> <br />MEMORANDUM <br /> <br />Date, February 11, 1992 <br />To, Mike Gross <br />From, Chuck Brendecke <br />Re, Informational Materials for 2/19/92 Sponsors Comntittee Meeting <br />Gunnison Basin Planning Model Project - <br /> <br />Attached you will fmd rwo documents which are meant to provide starting points for Planning <br />Model discussions at the February 19 Sponsors Committee meeting. The first document is a summary <br />descripti9n of the existing ba.'iiin model. The second is a questionnaire addressing model use and com- <br />puting facilities. <br /> <br />The model summary is provided as a convenient means to begin getting everyone "up to speed" <br />on what the existing model uocs and does nm do. It will be necessary for everyone to have a good un- <br />derstanding of the capabilities of the existing model in order to define what they want done differently <br />in the new model. f'or those wanting more dClail before the meeting than,is presented in the summary, I <br />would suggest Lhey refer LO the Task 5 Technical Memorandum from the Phase I study. <br /> <br />The questionnaire has two purposes. One set of questions is designed to gel people thinking. at <br />a fairly high level, about what they will want to do with the model. The second set of questions is <br />designed lO give us some information about the computing environments within which the various <br />entities will use the model. Both sets of questions will lead to more detailed questions and discussion as <br />we move through the needs analysis. I would like someone from each of the sponsoring emities to fill <br />out the questionnaire and brin~ it to the meeting so I can collect them all at oncc. <br /> <br />I would encourage anyone having a question about these materials to call me before the mc.:et- <br /> <br />lng. <br /> <br />cc: Sponsors Committee w/attachments <br /> <br />rnr~~~\lJ1~~ 11 <br />llLFEB 1 3 1992 U <br />BY DIVISION 4 <br /> <br />cmb,jd <br />GVROJECrS\179\001\COOlID\LETTERS\2.11.92.MEM 02/11/92 3A8 PM <br /> <br />Hydrosphere 1002 Walnut Suite 200 Boulder, Colorado 80302 <br />
The URL can be used to link to this page
Your browser does not support the video tag.