Laserfiche WebLink
<br />- <br /> <br />- <br /> <br />. 0 <br /> r.:.- <br /> ~, <br /> 0') <br /> ;"". <br /> (.;.') <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />Total Project Construction Cost <br /> <br /> Table IV-l <br /> Price-San Rafael Rivers Unit <br /> Cost Effectiveness Analysis <br />(Increments less than $50jton only) <br /> combined Agency <br />Spdnkler Irrigation Plan Reclamation <br /> (3,488 acres) <br /> Winter Total <br />On-Farm Off-Farm Total Water Project <br />2,265,714 7"18,000 3,043,714 7,066,000 10,109,714 <br />679,714 0 679.714 0 679,714 <br />1,586,000 778,000 2,364,000 7,066,000 9,430,000 <br />0 69,048 69,048 0 69,048 <br />1,586,000 847,048 2,433,047 7,066,000 9,499,047 <br />142,791 76,261 219,052 636,166 855,218 <br />35,600 0 35,600 54,000 89,600 <br />5,712 2,251 7,963 0 7,963 <br />184,103 78.512 262,615 690,166 952,781 <br />6,446 13. 6,585 21,800 28,385 <br />2. 565 40 32 34 <br /> <br />Less 30% Farmer Cost Share <br /> <br />Total Federal Construction Cost <br /> <br />Interest During Construction <br /> <br />Subtotal <br /> <br />Annual Equivalent Cost <br /> <br />Annual OM&R Cost ~I <br /> <br />Annual Mitigation Cost 11 <br /> <br />Total Annual Cost <br /> <br />Tons of Salt Removed Annually <br /> <br />Cost Effectiveness ($/ton) <br /> <br />y <br />.Y <br /> <br />On-farm costs for Sprinkler Irrigation Plan are for replacement only. On-farm operation and maintenance and <br />pumping power costs are considered to be local costs and are not included in this analysis. <br />Mitigation costs for on-farm portion of Sprinkler Irrigation plan are assumed to be 4 percent of the annual <br />equivalent construction cost. This value is based on SCS experience and policy for handling other similar <br />projects. <br /> <br />- <br /> <br />- <br /> <br />- <br />