<br />. <br /> <br />. <br /> <br />Some changes, such as adding new facilities to the system, result in O&M <br />increases that are of a continuing nature. Some of the projected increase in <br />1982 is the result of additions at the Au1t and Archer Substations. <br /> <br />Other occurrences, such as the replacement of moveable property or doing work <br />that is required only once or on an infrequent basis, result in a significant <br />cost increase in a particular year and then do not affect future years. Over <br />$2,000,000 in O&M costs, for replacing an airplane and for eliminating <br />polychlorinated biphenyl (PCB) from electrical equipment, were FY 1982 costs <br />of this type. <br /> <br />You can see that 1984 obviously is expected to have some infrequently <br />occurring O&M costs. Costs for succeeding years are actually at lower <br />levels. There is about $2,250,000 budgeted for Glen Canyon spillway repairs <br />during 1984. <br /> <br />8 <br />