My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00950
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:34 PM
Creation date
10/11/2006 10:03:50 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
11/16/1982
Author
USDOE/WAPA
Title
Information Forum, CRSP, Proposed Adjustments of Transmission and Power Rates
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Both generation and transmission facility additions are planned between 1982 <br />and 1991 that will increase the FY 1981 power investment from $538,215,000 to <br />about $1.1 billion. There are two principal additions projected in the FY <br />1981 study that account for most of the additional investments shown here. <br />Over $475,000,000 in power costs are associated with the Central Utah <br />Project, Bonneville Unit generating facilities, and almost $95,000,000 have <br />been included for the western Colorado 345-kV transmission system. <br /> <br />The total power investment of $1.1 billion is about $420 million greater than <br />was in the FY 1977 study. <br /> <br />As a result of the increase in power investments, interest expenses also <br />increase. The total interest cost in the 1981 study is over $566 million, an <br />increase of about $236 million since 1977. Four interest rates have been <br />used in the 1981 study. The current interest rate of 9.352% applies to the <br />western Colorado 345-kV transmission system. <br /> <br />An increase in power investments also increases the replacement costs. In <br />addition to having more facilities to replace, costs are higher as a result <br />of inflation. Inflation, of course, affects the estimated costs for all <br />future investments. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.