My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00945
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00945
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:34 PM
Creation date
10/11/2006 10:03:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8442.400
Description
Missouri Basin - Pick Sloan Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
2/28/1985
Author
DoI, BoR
Title
Lake Andes - Wagner Unit Planning Report / draft Enviromental Statement
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SUMMARY TABLE <br />Lake Andes-Wagner Unit <br /> <br />Purposes: <br /> <br />Irrigation (45,000 acres) <br />Fish and Wildlife Enhancement <br /> <br />Maj or Features: <br /> <br />Pumping Plants: <br />North Bay (main plant) <br />Northwest Relift <br />North Branch Relift <br />Wagner Relift <br />Southeast Choteau No. 1 Re1ift <br />Southeast Choteau No. 2 Relift <br />Northeast Choteau Relift <br /> <br />Dynamic <br />Head (ftl <br />193 <br />75 <br />103 <br />56 <br />130 <br />149 <br />99 <br /> <br />Canals : <br />Main <br />North Branch <br />Southeast Choteau Creek No. 1 <br />Southeast Choteau Creek No. 2 <br />Northeast Choteau Creek <br /> <br />Length (miles) <br />16 <br />8 <br />4 <br />1 <br />0.8 <br /> <br />Water Source: <br />Missouri River at Lake Francis C~se <br />Averaged Annual Flow at Dam <br />Reservoir Capacity at Normal M~ximum <br />Elevation 1365 Feet <br /> <br />Annual Water Diversion for Project <br /> <br />Energy Requirement (Pumping Plants).: <br />Average Annual <br />Peak <br /> <br />Economic Costs (NED): <br />Construction (deferred drainage discounted) <br />Interest During Construction <br />Total Investment <br /> <br />Annual Equivalent Investment <br />Annual Opportunity Cost of Energy <br />Annual O&M <br />Total Annual Economic Cost (NED) <br /> <br />I <br />I <br />I <br />I <br /> <br />Annual Benefits: <br />Irrigation <br />Fish and wildlife <br />Unemployed Resources <br />Total Annual Benefits (NED) <br /> <br />S-vii <br /> <br />Capacity (ft3/s) <br />740 <br />40 <br />47 <br />90 <br />206 <br />72 <br />34 <br /> <br />Acres <br />Served <br />45,000 <br />2,545 <br />2,850 <br />5,500 <br />13 ,000 <br />4,434 <br />2,200 <br /> <br />Capacity (start, end) <br />710-100 <br />290-60 <br />215 <br />60 <br />90 <br /> <br />18,360,000 acre-feet <br /> <br />4,619,000 acre-feet <br /> <br />92,000 acre-feet <br /> <br />31,000 Megawatt-hours <br />21,300 kilowatts <br /> <br />$126,095,000 <br />14,344,000 <br />$140,439,000 <br /> <br />$ 11,766,000 <br /> 543,000 <br /> 1,085,000 <br />$ 13,394,000 <br />$ 13,095,000 <br /> 41,000 <br /> 436,000 <br />$ 13,572,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.