My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00898
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:23 PM
Creation date
10/11/2006 10:00:17 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
9/11/1984
Author
USDOI/WAPA
Title
Revised Proposed General Power Marketing Criteria and Allocation Criteria
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />from all sources $0 that the costs of growth and <br />the benefits of conservation are identified, and <br />! <br />. <br />assuring that re~ailing utilities have detailed <br />, <br />power supply infdrmation), Western will depend <br />upon contract provisions to ac~omplish the same <br />objectives. HOWElver, existing customers must <br />demonstrate compliance with the spirit of the <br />i <br />i <br />resale of electrjc energy article in their <br />contract to avoid a substantial reduction or loss <br /> <br />of in their post~1989 allocation. The applicant <br />qualifications, ~ow in Appendix B of the criteria, <br /> <br />, <br />will be revised ~s follows: <br /> <br />The following re~uirements must be met in order to <br />be eligible for 'an allocation of long-term <br />resources from t]he SLCA Integrated Projects: <br /> <br />I <br />, <br />(1) Each poten~ial applicant must have submitted <br /> <br />, <br />substantial,ly complete applicant profile data <br />to the SLCAO on or before December 30, 1983. <br /> <br />I <br />, <br />(2) Each poten~ial new customer must have had a <br /> <br />i <br />, <br />1982, load ~reater than 100 kilowatts. <br />, <br /> <br />(3) On or before January 1, 1984, each potential <br /> <br />customer must: <br /> <br />78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.