Laserfiche WebLink
<br />-. <br /> <br />I ',\ c, ' <br />__ uJ f)c'1 r L', <br />6. The basis of monthly obligations was changed from the 1 ,lit (') vil^C'( <br /> <br />resource pattern to load patterns. Load patterns are the <br /> <br />bases of existing obligations. <br /> <br />7. The minimum schedule requirement was changed from 65 percent <br />of the average capacity to 35 percent of the firm contract <br />rate of delivery (CROo), subject to adjustment by Western. <br />Thirty five percent of the firm CROo is an existing minimum. <br /> <br />8. A 23o-kV point of ~elivery was added at Four Corners, New <br />Mexico, and a 345-kV point of delivery that is expected to <br />be avail ab le at Shiprock, New Mexi co was added. The 230-kV <br />points of delivery at Lost Canyon and Four Corners may be <br />uprated to 345 kV prior to 1989, and this potential change <br />has been identified. <br /> <br />9. Statements were added to indicate that diversity among power <br />allocations will be retained by Western and that long-term <br /> <br />power commitments will be subject to minor reductions if <br />diversity and losses are not equal, as assumed. <br /> <br />10. A statement was added indicating that a reasonable <br />opportunity to discuss contract terms would be provided <br />prior to Western's contract offer and 'that allottees would <br />have at least 6 months to consider a contract offer. <br /> <br />Allottees would have more than 6 months to consider the <br /> <br />contract offer if the offer is made before March 3D, 1987. <br /> <br />7 <br />