My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00898
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:23 PM
Creation date
10/11/2006 10:00:17 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
9/11/1984
Author
USDOI/WAPA
Title
Revised Proposed General Power Marketing Criteria and Allocation Criteria
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />available generation from the Deer CreeK Powerplant for a period, <br />usually a month at a time, as satisfactory replacement of the losses <br />experienced. The diversions are made from October 15 - April 15. CRSP <br />has purchased the remaining output, exc~pt for power sales to the two <br />small project-related loads at the dam site which generally total less <br />than 100 MWh a year. <br /> <br />4 <br /> <br /> <br />. <br /> <br />ADDRESS: On or before October 26, 1984, 'written comments on the <br />revisions to the proposed criteria and :marketing plan may be sent to: <br /> <br />Mark N. Silverman <br />Acting Area Manager <br />Salt Lake City Area Office <br />Western Area Power Administration <br />P.O. Box 11606 <br />Salt Lake City, UT 84147 <br />Telephone: (891) 524-5493 <br /> <br />SUPPLEMENTARY INFORMATION: <br /> <br />Contents of Supplementary. Information Section <br />A. Summary of Revisions <br />B. Major Issues <br /> <br />C. Special Allocation Issues <br />D. Other Issues <br /> <br />E. Regulatory Procedure Requirements <br /> <br />A. Summary of Revisions <br /> <br />The major revisions to the proP9sed General Power Marketing <br />( <br />Criteria and Allocation Criteria are listed below: <br /> <br />1. Allocation priorities and eligibility requirements have been <br />clarified and modified to ;recognize priority of <br />
The URL can be used to link to this page
Your browser does not support the video tag.