My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00774
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:27:43 PM
Creation date
10/11/2006 9:56:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.a
Description
Animas La Plata Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/3000
Author
Unknown
Title
Animas La Plata Annual Operating Plan - From 2002 ALP-POC Notebook - Date Unknown
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />~,-, <br />, <br />, <br />,L <br /> <br />,'-I <br />1.;.- <br /> <br />;~I <br />~ '""'" .- <br /> <br />-, <br /> <br />i. i <br /> <br />:II <br />"t."_. <br /> <br />.:-1' <br />i, <br /> <br />II <br /> <br />....<::--- <br /> <br />..,- ~:-::- <br /> <br />,----; <br />. ~_ I <br /> <br />n <br />~ ..."':", <br />n <br />I.~~. <br /> <br />" I <br />. - <br />'''-'-"-:::. <br />n <br />"'=:'.-. <br />.~ <br />. , <br />. ..~ : <br />.kl <br />:'~~'. <br />,- <br />: I <br />J <br />,n', <br />"' <br /> <br />....,r:-:::. <br /> <br />~ ".,.' <br /> <br />',----; <br />': I <br />;" . <br />._.~-r,,- <br />in <br /> <br />'i <br />-I <br />I <br /> <br />! <br />I <br /> <br />0n2394 <br /> <br />o Collection of debris at inlets and outlets <br />o Check condition of concrete - cracks deterioration <br />o Leaks and seepage <br />o Surface defects <br />o Standby power <br />o Corrosion <br />o Check gate alignment (i.e., operability of gates/valves) <br />o Displacement (misalignment or differential movement) <br />o Erosion/Cavitation damage <br />o Discharge cannel conditions <br /> <br />Safety Procedures <br /> <br />Procedures for ''Tagging and Locking Out" Equipment <br />Procedures for Confined Space Entry <br />Procedures for Hazardous Materials Management <br />SPCC Plans <br /> <br />Protective Coating -Inspections and Maintenance <br /> <br />Instrumentation and Reading Schedule <br /> <br />Water pressure monitoring devices <br />o Observation wells <br />o Uplift pressure gauges <br />o Porous -tube piezometers <br />o Pneumatic piezometers <br />o Vibrating-wire piezometers <br />Other pressure monitoring devices <br />o Earth pressure cells <br />o Concrete stress cells <br />o Load cells <br />Resistance thermometers and thermocouples for measuring temperature changes <br />Surveyed measurement points or locations, monitored for settlements and/or <br />deflections, located on abutment slopes, landslide areas, embankment surfaces, or <br />concrete structures <br />Other deformation monitoring installations <br />o Inclimometers <br />o Extensometers <br />o IVM (internal vertical movement) installations <br />o Baseplates <br />o Shear strips <br />o Tiltmetres <br />o Strain gauges <br />o Crack meters <br />o Joint meters <br />o Plumbline installation <br /> <br />'-~/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.