Laserfiche WebLink
<br />,,:~.., e.,~ <br />U J __,J; 2 <br /> <br />'. <br /> <br />Gunnison River Contract ScoDiD. . SORTED Comments <br /> <br />.,.;,' <br /> <br />,,;-T:/::;~;.:; <br /> <br />";';-:'. <br /> <br />la. <br /> <br />I. 01. <br />dernaods. <br /> <br />Historic management - protect Upper Basin from Aspinall demands, senior water right <br /> <br />la. I. 12. Address current operation -- fully explain existing situation at Aspinall related to. <br />target levels and committed storage. <br /> <br />la. 2. 18. Relationship of long-term WAPA power contracts and this contract: Will WAPA <br />contI;1lcts control what this contract does? <br /> <br />la; 2.1. 40. How much water has been released to satisfy Gunnison Tunnel and Redlands (water <br />rights)? How does it vary from what BOR would like? <br /> <br />la. . 4. 14. <br />studies)? <br /> <br />Will Crystal (outlets) prevent reaching upper flows (requested for endangered fish <br /> <br />la. 5. . 13. Does Blue Mesa have minimum pool? Will Blue Mesa level be affected Oowered in <br />spring); need this information. <br /> <br />la. 5. 38. Need to identify how much Bureau of Reclamation (Blue Mesa) water is benefitting <br />water users today. <br /> <br />la. <br /> <br />CREDA; p5, '2. What hydrologic data and analysis supports the statement that the period since 1977 <br />'include a representative range of dry, normal and wet water years" (page 5 of Information Packet)? <br /> <br />.':-;;').. <br />.... :'". <br />. (."':.~\J;~~; <br />:......S'. <br /> <br />la. <br /> <br />GREENO+; plO,'3. . The April 1992 Public Information Packet says 'a major operational objective <br />of the Aspinall Unit is to maximize water releases through the powerplant outlets at each dam' (page <br />8). This statement appears to conflict with the Union Park Decision's holding that hydropower is only <br />an incidental purpose. How can it be justified under the Union Park Decision and will power <br />production be allowed to overshadow other concerns in the contract negotiations? <br /> <br />la. MCCCOREY; p2, '2. Thermally: The Aspinall Unit has improved the downstream fishery due to <br />the more constant flows and lower water temperatures. There is excellent trout fishing to and below <br />Delta, which was not the case in pre-Aspinall Unit times. <br /> <br />lb. 1. 07. Address Dallas and Dolores Projects commitment (of the Aspinall Unit)- 148,000 <br />acre-feet depletion-- renegotiate? <br /> <br />lb. <br /> <br />1. <br /> <br />42. There is 300,000 acre-feet available from Blue Mesa for Gunnison Basin. <br />-- Not for entire State <br />-- Not available for trans-mountain diversion <br /> <br />lb. 1. 43. Contract should recognize 60,000 acre-feet depletion subordinated for use by Upper <br />Gunnison to protect it from any downstream call. <br /> <br />lb. 2.1. 01. <br /> sale. <br />lb. 2. I. 02. <br /> Mesa)? <br /> <br />Legal status and background (origin) of 250,000 acre-feet of Blue Mesa Water for <br /> <br />What is the number (300,000, 240,000?) (of aCTe-feet of water for sale from Blue <br /> <br />::1 <br />