My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00733
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:27:33 PM
Creation date
10/11/2006 9:56:04 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.105
Description
Colorado River-Water Projects-Navajo
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/9/2000
Author
BOR
Title
Re-Operation of Navajo Dam-Plan of Approach to Prepare an EIS for Navajo Reservoir Operations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A description of the resources potentially impacted, an assessment of those impacts, and an <br />evaluation of options to avoid or mitigate impacts will be prepared, following the standard Bureau <br />NEPA EIS format. A discussion of alternatives considered and rejected will be prepared, with a <br />description of the analysis and rationale for rejection, Data gaps in the existing baseline information <br />will be identified, <br /> <br />The technical aspects of each alternative will be described, the adequacy of existing <br />environmental data about each alternative evaluated, and additional information gathered following <br />written approval by Reclamation, Once these tasks have been completed, an in-depth analysis of <br />each alternative will be undertaken with the potential environmental impacts of each alternative <br />determined, After evaluation, a preferred alternative will then be selected, <br /> <br />Gatber Environmental Data <br /> <br />The adequacy of our data has been assessed, Field work is being conducted as necessary to <br />fill data gaps to allow an appraisal of potential impacts, <br /> <br />Conduct Analysis of Alternatives <br /> <br />An in-depth analysis will be completed for each alternative, The potential environmental <br />impacts of each alternative and their ability to meet project purpose and need will be compared to <br />each other. The results of the process leading to selection of the preferred alternative will be <br />presented in the DEIS and FEIS, <br /> <br />List of Resources Covered in the EIS <br /> <br />Air Quality & Noise <br />Aquatic Resources <br />Endangered Species <br />Environmental Justice <br />Flood Control <br />Geology & Soils <br />Hazardous Materials <br />Hydrology <br />Hydropower <br />Indian Trust Assets <br /> <br />Land Use <br />Limnology (Reservoir) <br />O&M and Dam Safety <br />Recreation <br />Socio-Economics <br />Water Quality <br />Water Rights <br />Wetlands <br />Wildlife <br /> <br />9 <br /> <br />01281 <br />
The URL can be used to link to this page
Your browser does not support the video tag.