Laserfiche WebLink
<br />OOO"/Li <br /> <br />. . <br /> <br />gage. Thus, the specific Water Quality Target for this TMDL is attainment of the <br />dissolved selenium standard at Whitewater near Grand Junction, <br /> <br />5, Source Analvsis <br /> <br />. The Source Analysis, for this TMDL, is a discussion of the sources (tributaries, <br />ditches, etc.) of selenium loading to the mainstem of the Gunnison River <br />. The Source Analysis was conducted by the Gunnison Basin Selenium Task <br />Force. The Source Analysis is in Publication A. <br />. A brief summary of the Gunnison Basin Selenium Task Force's Source Analysis <br />will be included. <br /> <br />6. Technical Analvsis <br /> <br />. The Technical Analysis, for this TMDL, is the discussion of the use of BMP's to <br />reduce selenium loading to the mainstem of the Gunnison River. <br />. The Technical Analysis was conducted by the Gunnison Basin Selenium Task <br />Fqrce, The Technical Analysis is in Publication B. <br />. A brief summary of the Gunnison Basin Selenium Task Force's Technical <br />Analysis will be included. . <br /> <br />7,TMDL Allocation <br /> <br />. Current load of selenium (Ibsjday) in the Gunnison River at Whitewater by <br />month or season. <br />. Load reduction necessary to meet water quality standard of 4.6 ug/I at <br />Whitewater by month or season. <br />. Total Maximum Daily Load necessary to meet water quality standard of 4.6 <br />ug/I at Whitewater by month or season. <br /> <br />8. Implementation and Adaptive Management Approach <br /> <br />- <br />· Implementation plan or discussion not required by EPA, but can be included if <br />the Task Force chooses, <br />· Adaptive Management Approach to allow flexibility to change BMP's, <br />technologies, etc, <br /> <br />9. Summarv of Public Involvement <br /> <br />· A brief history of the Gunnison Basin Selenium Task Force. <br />