<br />. <br /> <br />. <br /> <br />During the reporting period, 65 new casc contracts were <br />signed obligating a total of $1.6 million. In addition, 37 <br />long term agreements and 15 annual agreements were signed <br />N obligating $438,000 in ACP salinity funds. As of September <br />C.H 30, 1989 a total of 186 CRSC contracts have been signed. In <br />00 FY 1989, 83 sprinker systems and 60 miles of pipelines were <br />W installed. As a result, SCS estimates the annual reduction <br />in seepage and deep percolation ,to be 34,524 acre-feet for an <br />annual salt load reduction of 36,414 tons. <br /> <br />Glenwood-Dotsero S rin s Unit Reclamation - A proposal <br />for a e era -pr vate pro ect at enwoo Spr ngs has been <br />submi tted by Energy Ingenuity and Mission Energy Companies. <br />The proposal calls for a co-generation project with a 25 MW <br />gas fired generating unit with the waste heat being used for <br />desalting the Glenwood Springs flow. The proposal would <br />require no funding of construction by the federal government. <br />Reclamation would agree to with a 30\ nonfederal <br />reimbursement, to pay for the removal of and disposal of <br />70,000 tons of salt annually at the time of disposal at a <br />unit cost competitive with other salinity control units <br />identified in the plan of implementation. The Forum has <br />recommended that Reclamation move forward with the proposal <br />and request Congressional approval. <br /> <br />Price-San Rafael Rivers Unit Reclamation-De artment of <br />Agricu ture) - Rec amat on an SCS entered nto a ormal <br />agreement to prepare a joint plan of implementation and <br />Environmental Impact Statement. A joint Reclamation/SCS <br />draft plan is nearing completion and will be published for <br />review in 1991. <br /> <br />San Juan River Unit <br />~riculture) - In sea year 1989, Rec am at on comp ete ts <br />plan formufation activities for the San Juan River Unit in <br />the Hammond Area and will begin preparation of a Draft PR/EIS <br />in 1990. The recommended plan proposes to line all unlined <br />sections of the Hammond project irrigation system. A <br />preliminary investigation by SCS in 1989 indicates that an <br />onfarm program in the Hammond area appears feasible and cost <br />effective. Planning activities will continue in 1990. <br /> <br />Lower Vir in River Unit Reclamation - A combined water <br />supply sa n ty control proJect stu y was completed in 1988. <br />With Nevada Power Company's plans for construction of the <br />Harry Allen Power Plant deferred, further study of this unit <br />by Reclamation has been suspended as no other cost effective <br />salinity control scheme has been identified. A report to <br />document the studies to date has been completed. <br /> <br /> <br />-10- <br />