My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00629
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:59 PM
Creation date
10/11/2006 9:51:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Miscellaneous Small Projects and Project Studies - MWSI
State
CO
Basin
South Platte
Date
7/5/1994
Author
Hydrosphere
Title
Phase II Plan of Study, Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Metropolitan Water Supply Investigations - Phase II Plan of Study <br />7/5/94 4:17 PM <br /> <br />Page 8 <br /> <br />F. Study Products <br /> <br />This POS will serve as the draft final report for Phase I of the project, subject to <br />modifications in response to comments from the TAC and the State Team. <br /> <br />Study products for Phase II will consist of individual task memorandums, map/GIS <br />applications and summary reports as described for each of the tasks in the Detailed <br />Work Plan. The final Phase II report will be a Plan of Study for the Phase ill <br />analysis and evaluation of selected options. <br /> <br />III. DETAILED WORK PLAN <br /> <br />A. Task 4: Inventory of Existing Information <br /> <br />Overview' While much information exists relative to the MWSI project's focus <br />areas, relatively little is readily available and understandable from a regional and <br />cooperative perspective. As a first step toward development of cooperative water <br />supply solutions, an adequate and readily accessible knowledge base must be <br />provided. Task 4 consists of a series of 14 sub-tasks designed to provide such a <br />knowledge base. In their respective subject areas, these sub-tasks will: <br /> <br />. review and compile readily available existing information, <br /> <br />. identify information disparities, <br /> <br />. make recommendations to the T AC to conduct, contract for or sponsor studies <br />to supply critical missing information, and <br /> <br />. report in layman's terms on this background review. <br /> <br />Task Leader' Lee Rozaklis <br /> <br />Key Technical Support. Technical staff from Hydrosphere and subcontractors as <br />needed. <br /> <br />1. Sub-Task 4a: Resource Assessment of Denver Basin Aquifers <br /> <br />aJ Purpose: <br />Review background information and identify issues related to potential use of <br />Denver Basin aquifers for conjunctive use groundwater projects north of the <br />Palmer divide. <br />
The URL can be used to link to this page
Your browser does not support the video tag.