Laserfiche WebLink
<br />Metropolitan Water Supply Investigations - Phase II Plan of Study <br />7/5/94 4: 17 PM <br /> <br />Page 29 <br /> <br />c) Output <br />A summary report document. <br /> <br />to Sub-Task Leader: Lee Rozaklis <br /> <br />5. Sub-Task 5e: Phase II Screening <br /> <br />a) Purpose <br /> <br />To select the most promising water supply options for further study, and to <br />scope the next phase of the Project. . <br /> <br />b) flpproach <br /> <br />The T AC and the PMT will meet to review and discuss the Task 5 summary <br />reports and set priorities for the Project's next phase. Specific areas of study <br />will be identified. <br /> <br />c) Output <br /> <br />A phase ill scope of services, including a list of selected topics for further <br />study. <br /> <br />d) Sub-Task Leader: Robert Weaver <br /> <br />C. Task 6: Phase III Plan of Study. <br /> <br />a) Purpose <br />Based on the results of Phase II including Sub-task 5e, this task will develop a <br />plan of study for the next phase of the Project. <br /> <br />b) Approach <br />The consultant team will incorporate the results of Phase II including the <br />T AC' s Phase II screening efforts into a draft Phase ill Plan of Study. This <br />draft will be review by the T AC and PMT and comments will be incorporated <br />into a fmal Phase ill Plan of Study. <br /> <br />c) Output <br />A draft and fmal Phase ill Plan of Study will be prepared. <br /> <br />d) Task Leader: Lee Rozaklis <br />